共 30 条
- [23] Efficient fire protection systems lower risks in construction sites: Optimized management using ready-to-install pipe connections Technische Sicherheit, 2022, 12 (11-12): : 22 - 24
- [26] Using the multiple scenario approach for envisioning plausible futures in long-term planning and management of the urban water pipe systems European Journal of Futures Research, 2018, 6
- [27] DEVELOPMENT AND TRIALS OF 400KV INTEGRAL PIPE-COOLED SYSTEM STUDY OF MECHANICAL-BEHAVIOR OF CABLES IN INTEGRAL-PIPE WATER-COOLED SYSTEMS AND DESIGN AND CONSTRUCTION OF 400KV CABLE SYSTEM FOR SEVERN TUNNEL - DISCUSSION PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1978, 125 (10): : 1015 - 1020
- [28] Lifeline Infrastructure Systems for Your Water Supply, Transmission, and Distribution Systems: A Step-Wise Approach to the Design and Construction of Seismic-Resistant Pipe, Fittings, Valves, and Fire Hydrants LIFELINES 2022: 1971 SAN FERNANDO EARTHQUAKE AND LIFELINE INFRASTRUCTURE, 2022, : 654 - 665
- [30] An investigation using finite element analysis has been made into the stresses that occur in the root pass weld of large diameter pipelines during construction. Stresses induced by lifting the pipe, shortly after welding the root pass, are shown to be the primary source of mechanical stress. 5 refs. Journal of pipelines, 1983, 3 (03): : 187 - 197