共 50 条
- [41] THE EOS(R) PROCESS - A NEW PROCESS FOR ENHANCED POLLUTION-CONTROL IN IRON-ORE SINTERING REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1992, 89 (06): : 511 - 518
- [44] Iron-ore sinter TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1929, 84 : 39 - 66
- [46] DEVELOPMENT OF IRON-ORE AND LIMESTONE PRE-GRANULATION METHOD FOR SINTERING PROCESS .3. PROPERTIES OF IRON-ORE AND LIMESTONE PRE-GRANULATED SINTER TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S59 - S59
- [47] LAYOUT OF AN IRON-ORE PIPELINE IN COMPARISON WITH ALREADY OPERATED IRON-ORE PIPELINES STAHL UND EISEN, 1978, 98 (19): : 975 - 979
- [50] DEVELOPMENT OF IRON-ORE AND LIMESTONE PRE-GRANULATION METHOD FOR SINTERING PROCESS .3. TEST OPERATION OF IRON-ORE SINTERING PROCESS APPLIED PRE-GRANULATION METHOD TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S58 - S58