SURVEYING OF MODELS FOR CONSTRUCTION OF CHEMICAL PLANTS

被引:0
|
作者
EICHLER, D
机构
来源
CHEMISCHE TECHNIK | 1970年 / 22卷 / 06期
关键词
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
引用
收藏
页码:355 / &
相关论文
共 50 条
  • [21] PROBLEMS OF MODERN CONSTRUCTION IN ERECTION OF CHEMICAL PLANTS .2.
    HONTI, G
    MAGYAR KEMIKUSOK LAPJA, 1971, 26 (08): : 369 - &
  • [22] TIME AND RESOURCE ASPECTS OF PROJECT MANAGEMENT IN CONSTRUCTION OF CHEMICAL PLANTS
    MCKENZIE, G
    TRANSACTIONS OF THE INSTITUTION OF CHEMICAL ENGINEERS AND THE CHEMICAL ENGINEER, 1967, 45 (05): : C118 - &
  • [23] CHEMICAL PROCESS PILOT PLANTS - PURPOSE, DESIGN, CONSTRUCTION, AND OPERATION
    BARNEBEY, HL
    INDUSTRIAL AND ENGINEERING CHEMISTRY, 1945, 37 (05): : 413 - 417
  • [24] Use of the physicochemical models in control systems in chemical plants
    Oracz, P
    Wojtowicz, J
    INZYNIERIA CHEMICZNA I PROCESOWA, 2001, 22 (3D): : 1061 - 1066
  • [25] Methods for surveying plants in natural settings for viruses
    Melcher, U.
    Grover, V.
    Muthukumar, V.
    Zhang, F.
    Blinkova, O.
    PHYTOPATHOLOGY, 2006, 96 (06) : S77 - S77
  • [26] Surveying of Gypsum Models and digitized Models: a Comparison of the Meaningfulness
    Wunderlich, Anne
    INFORMATIONEN AUS ORTHODONTIE UND KIEFERORTHOPAEDIE, 2015, 47 (02): : 131 - 131
  • [27] SURVEYING - THE MIDDLE LINK BETWEEN DESIGN AND CONSTRUCTION
    ACKERMANN, DR
    PUBLIC WORKS, 1983, 114 (10): : 80 - 81
  • [28] Technology Landscape for Surveying and Mapping in Construction Industry
    Hidayat, F.
    Arifin, A.
    Farrosi, M. A. A.
    Soemardi, B. W.
    Pradoto, R. G. K.
    Puri, E. R.
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2022, 14 (09): : 74 - 80
  • [29] New Platform Connects Construction and Surveying Professionals
    不详
    GIM INTERNATIONAL-THE WORLDWIDE MAGAZINE FOR GEOMATICS, 2020, 34 (01): : 7 - 7
  • [30] Surveying Instruments: Their Design, Construction, Testing, and Adjustment
    Hinks, Arthur R.
    GEOGRAPHICAL JOURNAL, 1926, 68 (01): : 88 - 89