PREVENTIVE MAINTENANCE .1. PUMPING STATION EQUIPMENT

被引:0
|
作者
MACCREA, JM
机构
来源
SEWAGE AND INDUSTRIAL WASTES | 1953年 / 25卷 / 12期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:1452 / 1456
页数:5
相关论文
共 50 条
  • [31] Lab Equipment Maintenance BE PREPARED FOR THE UNKNOWN WITH PREVENTIVE CARE
    Kridelbaugh, Donna
    Lab Manager, 2019, 14 (11): : 18 - 21
  • [32] Preventive Approach to Machinery and Equipment Maintenance in Manufacturing Companies
    Mrugalska, Beata
    Zasada, Barbara
    Wyrwicka, Magdalena K.
    ADVANCES IN MANUFACTURING, PRODUCTION MANAGEMENT AND PROCESS CONTROL, 2019, 793 : 540 - 548
  • [34] Comprehensive Framework for Preventive Maintenance Priority of Medical Equipment
    Saleh, Neven
    Balestra, Gabriella
    2015 37TH ANNUAL INTERNATIONAL CONFERENCE OF THE IEEE ENGINEERING IN MEDICINE AND BIOLOGY SOCIETY (EMBC), 2015, : 1227 - 1230
  • [35] MATERIALS HANDLING EQUIPMENT - PREVENTIVE AND PREDICTIVE MAINTENANCE.
    Claire, Frank V.
    National safety news, 1980, 122 (06): : 64 - 66
  • [36] Optimal Inspection and Preventive Maintenance Scheduling of Mining Equipment
    Enzo Angeles
    Mustafa Kumral
    Journal of Failure Analysis and Prevention, 2020, 20 : 1408 - 1416
  • [37] Yield aware equipment preventive maintenance (PM) optimization
    Inani, A.
    Kim, J.
    Liao, M.
    Shimazu, K.
    Lin, Y.
    Arthanari, S.
    Stine, B.
    2007 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE, 2007, : 127 - +
  • [38] Preventive maintenance of overvoltage protection devices for electrical equipment
    Danilin, A.N.
    Izvestiya Akademii Nauk. Energetika, 2001, (01): : 84 - 93
  • [39] Optimal periodic preventive maintenance policy for leased equipment
    Pongpech, J.
    Murthy, D. N. P.
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (07) : 772 - 777
  • [40] Optimization of Preventive Maintenance Program for Imaging Equipment in Hospitals
    Marmolejo-Correa, Danahe
    Juarez-Valdivia, Rosa G.
    Rodriguez-Navarro, Alejandra
    26TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING (ESCAPE), PT B, 2016, 38B : 1833 - 1838