IMPACT OF MAINTAINABILITY ON THE INTERNATIONAL THERMONUCLEAR EXPERIMENTAL REACTOR (ITER) CONFIGURATION OPTIONS

被引:0
|
作者
LOUSTEAU, DC
机构
来源
FUSION TECHNOLOGY | 1989年 / 15卷 / 02期
关键词
D O I
10.13182/FST89-A39771
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
引用
收藏
页码:649 / 653
页数:5
相关论文
共 50 条
  • [41] Neutral beams for the international thermonuclear experimental reactor
    Inoue, T
    Di Pietro, E
    Mondino, PL
    Bayetti, P
    Hemsworth, RS
    Massmann, P
    Fujiwara, Y
    Hanada, M
    Miyamoto, K
    Okumura, Y
    Watanabe, K
    Krylov, A
    Kulygin, V
    Panasenkov, A
    REVIEW OF SCIENTIFIC INSTRUMENTS, 2000, 71 (02): : 744 - 746
  • [42] Recommendations on the nature and level of US participation in the International Thermonuclear Experimental Reactor (ITER) extension of the engineering design activities
    Grunder, H
    Berry, L
    Ellis, W
    Fonck, R
    Freidberg, J
    Gebbie, KB
    Hawryluk, RJ
    Montgomery, B
    Navratil, G
    Neilson, H
    Perkins, J
    Rosen, SL
    Schoenberg, K
    Weitzner, H
    JOURNAL OF FUSION ENERGY, 2000, 19 (01) : 35 - 44
  • [44] Heat Transfer at Mixed Convection in Horizontal Flat Channels of the Vacuum Vessel of the International Thermonuclear Experimental Reactor (ITER)
    B. F. Balunov
    A. S. Babykin
    T. S. Zhivitskaya
    V. A. Krylov
    V. N. Tanchuk
    S. A. Grigor'ev
    High Temperature, 2004, 42 : 278 - 285
  • [45] Heat transfer at mixed convection in horizontal flat channels of the vacuum vessel of the international thermonuclear experimental reactor (ITER)
    Balunov, BF
    Babykin, AS
    Zhivitskaya, TS
    Krylov, VA
    Tanchuk, VN
    Grigor'ev, SA
    HIGH TEMPERATURE, 2004, 42 (02) : 278 - 285
  • [46] Opportunities in the Construction Phase of the International Thermonuclear Experimental Reactor
    S. O. Dean
    W. R. Ellis
    A. Favale
    H. Forsen
    C. Hamilton
    S. D. Harkness
    R. C. Iotti
    S. L. Rosen
    Journal of Fusion Energy, 1999, 18 : 97 - 108
  • [47] Opportunities in the construction phase of the international thermonuclear experimental reactor
    Fusion Power Associates, Gaithersburg, MD 20879, United States
    不详
    不详
    不详
    不详
    不详
    不详
    J Fusion Energy, 2 (97-108):
  • [48] TRANSP simulations of International Thermonuclear Experimental Reactor plasmas
    Budny, RV
    McCune, DC
    Redi, MH
    Schivell, J
    Wieland, RM
    PHYSICS OF PLASMAS, 1996, 3 (12) : 4583 - 4593
  • [49] Opportunities in the construction phase of the international thermonuclear experimental reactor
    Dean, SO
    Ellis, WR
    Favale, A
    Forsen, H
    Hamilton, C
    Harkness, SD
    Iotti, RC
    Rosen, SL
    JOURNAL OF FUSION ENERGY, 1999, 18 (02) : 97 - 108
  • [50] REMOTE MAINTENANCE CHALLENGES FOR THE INTERNATIONAL THERMONUCLEAR EXPERIMENTAL REACTOR
    LOUSTEAU, DC
    HERNDON, JN
    DAVIS, FC
    SCHROCK, SL
    FUSION TECHNOLOGY, 1992, 21 (03): : 1389 - 1396