Investigating emergency room service quality using lean manufacturing

被引:14
|
作者
Abdelhadi, Abdelhakim [1 ]
机构
[1] Prince Sultan Univ, Dept Engn Management, Riyadh, Saudi Arabia
关键词
Benchmarking; Lean manufacturing; Takt time; Emergency room;
D O I
10.1108/IJHCQA-01-2015-0006
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
Purpose - The purpose of this paper is to investigate a lean manufacturing metric called Takt time as a benchmark evaluation measure to evaluate a public hospital's service quality. Lean manufacturing is an established managerial philosophy with a proven track record in industry. A lean metric called Takt time is applied as a measure to compare the relative efficiency between two emergency departments (EDs) belonging to the same public hospital. Outcomes guide managers to improve patient services and increase hospital performances. Design/methodology/approach - The patient treatment lead time within the hospital's two EDs (one department serves male and the other female patients) are the study's focus. A lean metric called Takt time is used to find the service's relative efficiency. Findings - Findings show that the lean manufacturing metric called Takt time can be used as an effective way to measure service efficiency by analyzing relative efficiency and identifies bottlenecks in different departments providing the same services. Originality/value - The paper presents a new procedure to compare relative efficiency between two EDs. It can be applied to any healthcare facility.
引用
下载
收藏
页码:510 / 519
页数:10
相关论文
共 50 条
  • [31] An Analysis of hospital characteristics on lean and service quality
    Vanichchinchai, Assadej
    INTERNATIONAL JOURNAL OF LEAN SIX SIGMA, 2021, 12 (06) : 1184 - 1208
  • [32] Lean practices: assessing the relationship among manufacturing and service firms
    Chowdary, Boppana V.
    Harrison, Stefan
    International Journal of Industrial and Systems Engineering, 2024, 47 (04) : 421 - 451
  • [33] INVESTIGATING THEME PARK SERVICE QUALITY BY USING MODIFIED THEMEQUAL MODEL
    Valcic, Iva
    Komsic, Jelena
    Simpson, Nigel Christopher
    3RD INTERNATIONAL SCIENTIFIC CONFERENCE TOSEE - TOURISM IN SOUTHERN AND EASTERN EUROPE 2015: SUSTAINABLE TOURISM, ECONOMIC DEVELOPMENT AND QUALITY OF LIFE, 2015, 3 : 453 - 466
  • [34] Das amerikanische Notfallwesen – “emergency medical service” und “emergency room”
    J. Koppenberg
    S.M. Briggs
    S. K. Wedel
    A. K. Conn
    Notfall & Rettungsmedizin, 2002, 5 (8): : 598 - 605
  • [35] SIMULATION-BASED VERIFICATION OF LEAN IMPROVEMENT FOR EMERGENCY ROOM PROCESS
    Khurma, Nancy
    Bacioiu, Gheorghe M.
    Pasek, Zbigniew J.
    2008 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2008, : 1490 - 1499
  • [36] Impact of Lean Manufacturing on Productivity and Quality in a Food Company
    de la Fuente Aragon, M. Victoria
    Ros-McDonnell, Lorenzo
    Cardos Carboneras, Manuel
    ENGINEERING DIGITAL TRANSFORMATION, 2019, : 159 - 166
  • [37] Total Quality Management and Quality Circles in the Digital Lean Manufacturing World
    Romero, David
    Gaiardelli, Paolo
    Powel, Daryl
    Wuest, Thorsten
    Thurer, Matthias
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR THE FACTORY OF THE FUTURE, PT I, 2019, : 3 - 11
  • [38] Investigating "circular business models" in the manufacturing and service sectors
    Upadhyay, Arvind
    Akter, Shaheda
    Adams, Lindsay
    Kumar, Vikas
    Varma, Nikhil
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2019, 30 (03) : 590 - 606
  • [39] Investigating the enablers associated with implementation of Green Lean Six Sigma in manufacturing sector using Best Worst Method
    Kaswan, Mahender Singh
    Rathi, Rajeev
    CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2020, 22 (04) : 865 - 876
  • [40] Investigating the enablers associated with implementation of Green Lean Six Sigma in manufacturing sector using Best Worst Method
    Mahender Singh Kaswan
    Rajeev Rathi
    Clean Technologies and Environmental Policy, 2020, 22 : 865 - 876