共 45 条
- [27] THERMAL LOADING OF FIN-TUBE BODY OF AN ONCE-THROUGH STEAM-GENERATOR WITH STEPPED MELTING CHAMBER BRENNSTOFF-WARME-KRAFT, 1973, 25 (05): : 187 - 192
- [28] TESTS MADE ON A 45-MW MODEL OF PHENIX STEAM-GENERATOR AT CGVS (HIGH-CAPACITY TESTING UNIT FOR SODIUM-HEATED STEAM-GENERATORS) TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1973, 17 (NOV): : 382 - 384
- [29] Experimental investigation on once-through steam generator stability under low thermal parameter Yuanzineng Kexue Jishu, 2006, 1 (1-4):