共 50 条
- [41] PENETRANT TESTING IN QUALITY-CONTROL OF NUCLEAR-POWER PLANT CONSTRUCTION [J]. NDT INTERNATIONAL, 1977, 10 (01): : 9 - 12
- [42] COSTS ARISING FROM THE DELAY IN GERMAN NUCLEAR-POWER PLANT CONSTRUCTION [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1981, 26 (06): : 357 - 358
- [43] THE CONTINUITY OF THE MAINTENANCE PREPARATION WITH THE NUCLEAR-POWER PLANT CONSTRUCTION PREPARATION AND REALIZATION [J]. JADERNA ENERGIE, 1982, 28 (11): : 415 - 419
- [44] PAKS NUCLEAR-POWER PLANT - CONSTRUCTION AND ASSEMBLING OF THE BUBBLING DEPRESSURIZATION CONTAINMENTS [J]. JADERNA ENERGIE, 1983, 29 (12): : 424 - 428
- [45] RESULTS OF GEOPHYSICAL STUDIES IN THE REGION OF THE CRIMEA NUCLEAR-POWER PLANT CONSTRUCTION [J]. DOPOVIDI AKADEMII NAUK UKRAINSKOI RSR SERIYA B-GEOLOGICHNI KHIMICHNI TA BIOLOGICHNI NAUKI, 1989, (10): : 6 - 11
- [46] STATE-REGULATION OF NUCLEAR-POWER PLANT CONSTRUCTION - IOWA MODEL [J]. IOWA LAW REVIEW, 1977, 63 (01) : 124 - 150
- [47] EXPERIENCE WITH CONSTRUCTION OF YUGOSLAVIAS 1ST NUCLEAR-POWER PLANT [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1977, 25 : 58 - 59
- [48] A Case Study on the Use of Aluminum Forms in Nuclear Power Plant Construction [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 296 - 299
- [50] DELAYS IN CONSTRUCTION OF NUCLEAR-POWER PLANTS [J]. JOURNAL OF THE ENERGY DIVISION-ASCE, 1979, 105 (01): : 33 - 46