A HEURISTIC FOR A CLASS OF PRODUCTION PLANNING AND SCHEDULING PROBLEMS

被引:7
|
作者
GILBERT, KC [1 ]
MADAN, MS [1 ]
机构
[1] UNIV WISCONSIN,DEPT MANAGEMENT,WHITEWATER,WI 53190
关键词
D O I
10.1080/07408179108963863
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper describes a solution technique for a general class of problems referred to as aggregate planning and master scheduling problems. The technique is also applicable to multi-item single level capacitated lot sizing problems. The solution technique presented here is a heuristic that is practical for large problems e.g. 9 products and 36 periods. We have tested it for problems with varying number of time periods, number of products, setup costs, holding costs, overtime costs and capacity levels. For those problems that we could solve exactly using a branch and bound algorithm, the solutions produced by the heuristic were all within 1% of optimality. For problems that we could not solve exactly, we are able to compute a lower bound on the optimal cost. Using the bound we are able to show that our heuristic solutions were within 2.93% of optimality on the average. Except for those problems having very high setup cost or problems with extreme seasonality, the algorithm produced solutions that were within 1% of optimality on average.
引用
收藏
页码:282 / 289
页数:8
相关论文
共 50 条
  • [41] A FLEXIBLE SCHEDULING ALGORITHM FOR STORAGE TANKS AND ITS APPLICATION TO PRODUCTION PLANNING PROBLEMS
    KUTSUWA, Y
    MATSUYAMA, H
    KODAMA, A
    OGAWA, M
    [J]. KAGAKU KOGAKU RONBUNSHU, 1991, 17 (06) : 1154 - 1160
  • [42] A heuristic for adaptive production scheduling and control in flow shop production
    Li, Wei
    Luo, Xinggang
    Xue, Deyi
    Tu, Yiliu
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (11) : 3151 - 3170
  • [43] Integration of Production Planning and Scheduling
    Maravelias, Christos T.
    [J]. 10TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2009, 27 : 117 - 118
  • [44] A new heuristic operator for job shop scheduling problems
    Zhao, Liang-hui
    Deng, Fei-qi
    [J]. 2006 10TH INTERNATIONAL CONFERENCE ON COMMUNICATION TECHNOLOGY, VOLS 1 AND 2, PROCEEDINGS, 2006, : 1375 - +
  • [45] Lagrangian heuristic for a class of the generalized assignment problems
    Litvinchev, Igor
    Mata, Miguel
    Rangel, Socorro
    Saucedo, Jania
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2010, 60 (04) : 1115 - 1123
  • [46] A Heuristic for Variable Re-Entrant Scheduling Problems
    van der Tempel, Roel
    van Pinxten, Joost
    Geilen, Marc
    Waqas, Umar
    [J]. 2018 21ST EUROMICRO CONFERENCE ON DIGITAL SYSTEM DESIGN (DSD 2018), 2018, : 336 - 341
  • [47] HEURISTIC SOLUTION TO THE SCHEDULING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEM
    MUKHOPADHYAY, SK
    MAITI, B
    GARG, S
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (10) : 2003 - 2024
  • [48] The Novel Heuristic for Data Transmission Dynamic Scheduling Problems
    Xu, Hao
    Zhao, Yue
    Xing, Li-Ning
    Zhou, You
    [J]. JOURNAL OF APPLIED MATHEMATICS, 2013,
  • [49] OPTIMALITY OF A HEURISTIC SOLUTION FOR A CLASS OF KNAPSACK PROBLEMS
    HU, TC
    LENARD, ML
    [J]. OPERATIONS RESEARCH, 1976, 24 (01) : 193 - 196
  • [50] A HEURISTIC DECOMPOSITION ALGORITHM FOR SCHEDULING PROBLEMS ON MIXED GRAPHS
    KRUGER, K
    SHAKHLEVICH, NV
    SOTSKOV, YN
    WERNER, F
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (12) : 1481 - 1497