共 50 条
- [21] Hopfield neural network for simultaneous job scheduling and data replication in grids [J]. FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2013, 29 (08): : 1885 - 1900
- [22] Improving job scheduling performance with dynamic replication strategy in Data Grids [J]. PARALLEL COMPUTING TECHNOLOGIES, PROCEEDINGS, 2007, 4671 : 194 - +
- [23] Qos-based algorithm for job allocation and scheduling in Data Grid [J]. GCC 2006: FIFTH INTERNATIONAL CONFERENCE ON GRID AND COOPERATIVE COMPUTING WORKSHOPS, PROCEEDINGS, 2006, : 20 - +
- [24] A Real-Time Data Grid Model With Centralized Job Scheduling [J]. 11TH MIDDLE EASTERN SIMULATION MULTICONFERENCE (MESM'2010) -1ST GAMEON-ARABIA CONFERENCE, 2010, : 133 - 137
- [26] A New 3-layer Replication and Scheduling Strategy In Data Grid [J]. 2008 INTERNATIONAL SYMPOSIUM ON TELECOMMUNICATIONS, VOLS 1 AND 2, 2008, : 464 - 469
- [28] DGridSim: A REAL-TIME DATA GRID SIMULATOR WITH HIERARCHICAL JOB AND DATA SCHEDULING [J]. SIMULTECH 2011: PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SIMULATION AND MODELING METHODOLOGIES, TECHNOLOGIES AND APPLICATIONS, 2011, : 174 - 179
- [29] Efficient and dynamic Parallel Job Scheduling for bioinformatics Data Management in Data Grid Environment [J]. RESEARCH JOURNAL OF PHARMACEUTICAL BIOLOGICAL AND CHEMICAL SCIENCES, 2015, 6 (03): : 1492 - 1501
- [30] Data Location-Aware Job Scheduling in the grid. Application to the Grid Way Metascheduler [J]. 17TH INTERNATIONAL CONFERENCE ON COMPUTING IN HIGH ENERGY AND NUCLEAR PHYSICS (CHEP09), 2010, 219