共 50 条
- [42] MODULAR DESIGN REDUCES NUCLEAR-POWER PLANT CONSTRUCTION TIME [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1973, 17 (NOV): : 386 - 386
- [43] MATHEMATICAL MODELING FOR CONTINGENCY DETERMINATION FOR NUCLEAR POWER PLANT CONSTRUCTION PROJECTS [J]. PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 6, 2014,
- [44] COSTS OF NUCLEAR-POWER-PLANT CONSTRUCTION - THEORY AND NEW EVIDENCE [J]. RAND JOURNAL OF ECONOMICS, 1991, 22 (01): : 148 - 154
- [45] Construction of an interim spent fuel store at the PAKS Nuclear power plant [J]. INTERNATIONAL CONFERENCE ON STORAGE IN NUCLEAR FUEL CYCLE, 1996, 1996 (07): : 235 - 250
- [46] CANADIAN NUCLEAR-POWER-PLANT CONSTRUCTION COST FORECAST AND ANALYSIS [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1985, 49 : 146 - 171
- [47] PREDICTING COSTS AND CONTROLLING PROGRESS IN NUCLEAR-POWER PLANT CONSTRUCTION [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 21 (JUN): : 401 - 402
- [48] A Case Study on the Use of Aluminum Forms in Nuclear Power Plant Construction [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 296 - 299
- [49] SCHEDULE-AND-PROCESS MANAGEMENT IN CONSTRUCTION OF A NUCLEAR POWER PLANT. [J]. American Society of Civil Engineers, Engineering Issues, Journal of Professional Activities, 1974, 16 (04): : 120 - 128
- [50] Natrium, the most advanced underground nuclear power plant under construction [J]. GALLERIE E GRANDI OPERE SOTTERRANEE, 2022, (144): : 67 - 68