共 50 条
- [32] A Framework for Evaluation of Social Costs of Open-Cut Pipeline Replacement for Sanitary Sewers PIPELINES 2020: CONDITION ASSESSMENT, CONSTRUCTION, REHABILITATION, AND TRENCHLESS TECHNOLOGIES, 2020, : 352 - 360
- [33] Bending the costs downwards - Possibilities of pipe bending in plant and pipeline construction ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2015, 110 (1-2): : 48 - 49
- [39] INNOVATIONS CUT COSTS OF A POWER PLANT'S WATER SYSTEM. Civil engineering New York, N.Y., 1982, 53 (07): : 46 - 49
- [40] Study on the efficiency of sequential batch reactor (SBR)-based sewage treatment plant Applied Water Science, 2019, 9