Capital project cost estimation methodologies. The colombian case study

被引:0
|
作者
Valderrama A., Maria C. [1 ,2 ]
Diez B., John M. [3 ,4 ,5 ,6 ]
Gaitan R., Sandra C. [5 ,7 ,8 ]
机构
[1] Pontificia Univ Javeriana, Bogota, Colombia
[2] Univ EAFIT, Adm, Sabaneta, Antioquia, Colombia
[3] Univ Nacl Colombia, Bogota, Colombia
[4] Univ Antioquia, Evaluac Proyectos, Medellin, Colombia
[5] Univ EAFIT, Sabaneta, Antioquia, Colombia
[6] Univ EAFIT, Dept Org & Gerencia, Sabaneta, Antioquia, Colombia
[7] Univ Nacl Colombia, Bogota, Colombia
[8] Univ EAFIT, Dept Finanzas, Sabaneta, Antioquia, Colombia
关键词
Capital Cost; Patrimony Costs; Risk; Discount Rates;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
A literature review using databases of the main Colombian universities was made in order to define the theoretical form of capital cost estimation in Colombia. Given a review of global popular methodologies, this article presents an approach to emergent countries, especially Colombia. Up to now, there has not been a general rule or best practice for such estimation; on the contrary, diverse difficulties to be solved exist in an environment where the effects are global and different local situations arise. Academic and pragmatic authors find diverse postures, which makes recommendable to investors or shareholders to permanently evaluate the results. Currently, available models as Capital Asset Pricing are still used and adjust various proposals to its original structure.
引用
收藏
页码:101 / 124
页数:24
相关论文
共 50 条
  • [21] On the estimation of cost of capital and its reliability
    Wong, WK
    Chan, RH
    QUANTITATIVE FINANCE, 2004, 4 (03) : 365 - 372
  • [22] THE ARBITRAGE PRICING THEORY AND COST-OF-CAPITAL ESTIMATION - THE CASE OF ELECTRIC UTILITIES
    GOLDENBERG, DH
    ROBIN, AJ
    JOURNAL OF FINANCIAL RESEARCH, 1991, 14 (03) : 181 - 196
  • [23] Project capital cost risks and contracting strategies
    Pedwell, Keith
    Hartman, Francis T.
    Jergeas, George F.
    Cost Engineering (Morgantown, West Virginia), 1998, 40 (01): : 37 - 41
  • [24] CAPITAL COST CONTROL DURING AN ACTUAL PROJECT
    GAWLER, AF
    CHEMISTRY & INDUSTRY, 1959, (41) : 1270 - 1270
  • [25] IMPLICIT CAPITAL-COST OF PROJECT INVESTMENTS
    MANDAKOVIC, T
    SMITH, LA
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1987, 34 (01) : 19 - 21
  • [26] Comparative study of synthesis surfaces support matrices for library generation using solid phase methodologies.
    Mendonca, AJ
    Warner, FP
    Coffey, AF
    Davies, JW
    Marsh, PA
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2002, 224 : U182 - U182
  • [27] Software cost estimation inhibitors -: A case study
    Magazinovic, Ana
    Pernstal, Joakim
    Ohman, Peter
    PRODUCT-FOCUSED SOFTWARE PROCESS IMPROVEMENT, PROCEEDINGS, 2008, 5089 : 61 - 74
  • [28] Integrating global hazardous location methodologies and technologies in a large capital project
    Roberton, R
    Cole, M
    Driscoll, T
    Morlidge, G
    Martin, K
    INDUSTRY APPLICATIONS SOCIETY 50TH ANNUAL PETROLEUM AND CHEMICAL INDUSTRY CONFERENCE, 2003, : 277 - 285
  • [29] MACHINE LEARNING METHODOLOGIES FOR PADDY YIELD ESTIMATION IN INDIA: A CASE STUDY
    Guruprasad, Ranjini B.
    Saurav, Kumar
    Randhawa, Sukanya
    2019 IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM (IGARSS 2019), 2019, : 7254 - 7257
  • [30] Estimating Capital cost of project based on behavioral capital pricing model
    Shao Xi-juan
    Kong Lei-lei
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10275 - 10278