共 50 条
- [22] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781
- [24] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (5-8): : 773 - 781
- [25] A HYBRIT APPROACH ON SINGLE SERVER PARALLEL MACHINES SCHEDULING PROBLEM WITH SEQUENCE DEPENDENT SETUP TIMES JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2011, 26 (04): : 731 - 740