共 50 条
- [31] Commissioning and initial operation of the Coleshill incineration plant Water Pollution Control, 1978, 77 (03): : 324 - 345
- [32] REFUSE GASIFICATION - EXPERIENCE OBTAINED IN REFUSE GASIFICATION PLANT OF KOLDING DENMARK BRENNSTOFF-WARME-KRAFT, 1968, 20 (09): : 433 - &
- [37] DIAGNOSIS SYSTEM OF ABNORMALITY IN REFUSE INCINERATION PLANT USING FUZZY-LOGIC JSME INTERNATIONAL JOURNAL SERIES C-DYNAMICS CONTROL ROBOTICS DESIGN AND MANUFACTURING, 1994, 37 (02): : 307 - 314
- [38] Optimal Operation of a Waste Incineration Plant for District Heating 2009 AMERICAN CONTROL CONFERENCE, VOLS 1-9, 2009, : 665 - +
- [40] Long-Distance Transport System for the Schwandorf Refuse Incineration Power Plant. VGB-Kraftwerkstechnik, 1985, 65 (12): : 1144 - 1150