Engineering rock mechanics practices in the underground powerhouse at Jinping I hydropower station

被引:20
|
作者
Wu, Aiqing [1 ]
Wang, Jimin [2 ]
Zhou, Zhong [3 ]
Huang, Shuling [1 ]
Ding, Xiuli [1 ]
Dong, Zhihong [1 ]
Zhang, Yuting [1 ]
机构
[1] Minist Water Resources, Key Lab Geotech Mech & Engn, Yangtze River Sci Res Inst, Wuhan 430010, Peoples R China
[2] Yalong River Hydropower Dev Co Ltd, Chengdu 610051, Peoples R China
[3] HydroChina Chengdu Engn Corp Ltd, Chengdu 610072, Peoples R China
基金
中国国家自然科学基金;
关键词
Underground powerhouse; High geo-stress; Rock mechanics; Rock mass stability; Engineering practice;
D O I
10.1016/j.jrmge.2016.05.001
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Based on the analyses of data obtained from the underground powerhouse at Jinping I hydropower station, a comprehensive review of engineering rock mechanics practice in the underground powerhouse is first conducted. The distribution of strata, lithology, and initial geo-stress, the excavation process and corresponding rock mass support measures, the deformation and failure characteristics of the surrounding rock mass, the stress characteristics of anchorage structures in the cavern complex, and numerical simulations of surrounding rockmass stability and anchor support performance are presented. The results indicate that the underground powerhouse of Jinping I hydropower station is characterized by high to extremely high geo-stresses during rock excavation. Excessive surrounding rock mass deformation and high stress of anchorage structures, surrounding rock mass unloading damage, and local cracking failure of surrounding rock masses, etc., are mainly caused by rock mass excavation. Deformations of surrounding rock masses and stresses in anchorage structures here are larger than those found elsewhere: 20% of extensometers in the main powerhouse record more than 50 mm with the maximum at around 250 mm observed in the downstream sidewall of the transformer hall. There are about 25% of the anchor bolts having recorded stresses of more than 200 MPa. Jinping I hydropower plant is the first to have an underground powerhouse construction conducted in host rocks under extremely high geo-stress conditions, with the ratio of rock mass strength to geo-stress of less than 2.0. The results can provide a reference to underground powerhouse construction in similar geological conditions. (C) 2016 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V.
引用
收藏
页码:640 / 650
页数:11
相关论文
共 50 条
  • [41] Attenuation regulation of blasting vibration of underground powerhouse excavation at Zhouning Hydropower Station
    Wang, YJ
    Lang, KS
    Tian, XB
    Theory and Practice of Energetic Materials, Vol 6, 2005, : 704 - 707
  • [42] Construction and monitoring study of large underground powerhouse caverns of Xiangjiaba Hydropower Station
    Fan, Qixiang
    Liu, Yiyong
    Wang, Yi
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2011, 30 (04): : 666 - 676
  • [43] Study on Mechanics Parameters of Unloaded Rock Mass about the Underground Powerhouse of Jin-ping Hydroelectric Station
    Fan Yongbo
    Wu Faquan
    CIVIL ENGINEERING IN CHINA - CURRENT PRACTICE AND RESEARCH REPORT, 2010, : 325 - +
  • [45] Inversion Analysis Based on the Unloading Rock Mass of Underground Powerhouse Monitoring Achievements of Jin Ping Cascade II Hydropower Station
    Liu, Jie
    Li, Jian-lin
    Xiao, Lei
    Luo, Shiwei
    Cai, Jian
    FRONTIERS OF ADVANCED MATERIALS AND ENGINEERING TECHNOLOGY, PTS 1-3, 2012, 430-432 : 1455 - 1459
  • [46] Back analysis of initial geostress field for underground powerhouse zone of Shuangjiangkou hydropower station
    Geotechnical and Structural Engineering Research Center, Shandong University, Jinan
    250061, China
    不详
    257400, China
    不详
    250013, China
    Tumu Gongcheng Xuebao, 8 (86-95): : 86 - 95
  • [47] Uncertainty Analysis and Risk Management of Underground Cavern Group at Jinping II Hydropower Station
    Zhang, Yong-Jie
    Feng, Xia-Ting
    Jiang, Quan
    GEOTECHNICAL SAFETY AND RISK V, 2015, : 645 - 651
  • [48] Practices on rockburst prevention and control in headrace tunnels of Jinping II hydropower station
    Wang, Jimin
    Zeng, Xionghui
    Zhou, Jifang
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2012, 4 (03) : 258 - 268
  • [49] Characteristics of damaged zones due to excavation in deep underground powerhouse at houziyan hydropower station
    State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu
    Sichuan
    610065, China
    不详
    Shandong
    650061, China
    不详
    Sichuan
    626005, China
    不详
    Sichuan
    610072, China
    Yanshilixue Yu Gongcheng Xuebao, 4 (735-746):
  • [50] Research on the regional stress field of underground powerhouse at the right bank of Baihetan hydropower station
    Zhao, Qing
    Leng, Xianlun
    He, Xiang
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1042 - +