A GENERALIZED-MODEL FOR THE ECONOMIC DESIGN OF (X)OVER-BAR-CONTROL CHARTS FOR PRODUCTION SYSTEMS WITH INCREASING FAILURE RATE AND EARLY REPLACEMENT

被引:0
|
作者
RAHIM, MA [1 ]
BANERJEE, PK [1 ]
机构
[1] UNIV NEW BRUNSWICK,DEPT MATH & STAT,FREDERICTON E3B 5A3,NB,CANADA
关键词
D O I
10.1002/1520-6750(199310)40:6<787::AID-NAV3220400605>3.0.CO;2-4
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This article generalizes the model for the economic design of xBAR-control charts of Duncan [4], starting from the more recent papers of Lorenzen and Vance [8] and Banerjee and Rahim [3]. The classical model of Duncan [4] and its several extensions including the unified model of Lorenzen and Vance [8] assumed exponentially distributed in-control periods and provided uniform sampling schemes. Banerjee and Rahim [3], however, assumed a Weibull-distributed in-control period having an increasing failure rate and used variable sampling intervals. The present article is an extension of the work of Banerjee and Rahim [3], where a general distribution of in-control periods having an increasing failure rate is assumed and the possibility of age-dependent repair before failure is considered. Several different truncated and nontruncated probability models are chosen. It is proposed that economic benefits can be achieved by adopting a nonuniform inspection scheme and by truncating a production cycle when it attains a certain age. Numerical examples are presented to support this proposition. Finally, the effect of model specification in the choice of failure mechanism is investigated. (C) 1993 John Wiley & Sons, Inc.
引用
收藏
页码:787 / 809
页数:23
相关论文
共 49 条