AN EXPERT SIMULATION SYSTEM FOR THE MASTER PRODUCTION SCHEDULE

被引:2
|
作者
LI, ZC
TANG, HL
TU, HJ
机构
[1] HUAZHONG UNIV SCI & TECHNOL,DEPT MANAGEMENT ENGN,WUHAN,PEOPLES R CHINA
[2] OFF BUSINESS ADM YANGZHOU,JIANGSU,PEOPLES R CHINA
[3] OFF HUAZHONG ELECT ADM,WUHAN,PEOPLES R CHINA
关键词
EXPERT SYSTEM; SIMULATION; MASTER PRODUCTION SCHEDULE; DECISION MAKING; KNOWLEDGE BASE; MODEL BASE; DATA BASE; INFERENCE ENGINE; INTERFACE; PRODUCTION MANAGEMENT;
D O I
10.1016/0166-3615(92)90012-C
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Both simulation and expert systems are computer-based modern management decision supporting techniques. In this paper, an expert simulation system for the master production schedule (ESSMPS) is presented. By integrating expert system, simulation, mathematical optimization and data base techniques, ESSMPS has been developed on an IBM PC using PC Plus expert system building tool, SIMAN simulation language, FORTRAN 77 and dBASE III Plus to help the production manager to work out a satisfactory master production schedule.
引用
收藏
页码:127 / 133
页数:7
相关论文
共 50 条
  • [41] AN EXPERT MANUFACTURING SIMULATION SYSTEM
    FORD, DR
    SCHROER, BJ
    [J]. SIMULATION, 1987, 48 (05) : 193 - 200
  • [42] An expert classification system for production system
    Park, HG
    Lee, JS
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) : 17 - 20
  • [43] Expert classification system for production system
    Park, Hwa Gyoo
    Lee, Jun Seok
    [J]. Computers and Industrial Engineering, 1998, 35 (1-2): : 17 - 20
  • [44] Constructing method of production decision making expert system based on interactive simulation
    Zhang, Xiao-Dong
    Zhang, Zhi-Qiang
    Chen, Jin
    Duan, Shuang-Yue
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2013, 19 (02): : 404 - 410
  • [45] A simulation-expert-system-based approach for machine sizing of production systems
    Masmoudi, Wassim
    Chtourou, Hedi
    Maalej, Aref Y.
    [J]. JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2006, 17 (02) : 187 - 198
  • [46] Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions
    Venkataraman, R
    Smith, SB
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (06) : 1517 - 1537
  • [47] A new simulation methodology for master production scheduling
    Davis, WJ
    Brook, A
    Lee, MS
    [J]. SMC '97 CONFERENCE PROCEEDINGS - 1997 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: CONFERENCE THEME: COMPUTATIONAL CYBERNETICS AND SIMULATION, 1997, : 1808 - 1813
  • [48] THE DYNAMICS OF HEDGING THE MASTER SCHEDULE
    GUERRERO, HH
    BAKER, KR
    SOUTHARD, MH
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) : 1475 - 1483
  • [49] Freezing the master production schedule under single resource constraint and demand uncertainty
    Xie, JX
    Zhao, XD
    Lee, TS
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 83 (01) : 65 - 84
  • [50] Impact of forecast horizon on replanning frequencies for a rolling horizon master production schedule
    Venkataraman, R
    Nathan, J
    [J]. DECISION SCIENCES INSTITUTE, 1997 ANNUAL MEETING, PROCEEDINGS, VOLS 1-3, 1997, : 1236 - 1238