AN EXPERT SIMULATION SYSTEM FOR THE MASTER PRODUCTION SCHEDULE

被引:2
|
作者
LI, ZC
TANG, HL
TU, HJ
机构
[1] HUAZHONG UNIV SCI & TECHNOL,DEPT MANAGEMENT ENGN,WUHAN,PEOPLES R CHINA
[2] OFF BUSINESS ADM YANGZHOU,JIANGSU,PEOPLES R CHINA
[3] OFF HUAZHONG ELECT ADM,WUHAN,PEOPLES R CHINA
关键词
EXPERT SYSTEM; SIMULATION; MASTER PRODUCTION SCHEDULE; DECISION MAKING; KNOWLEDGE BASE; MODEL BASE; DATA BASE; INFERENCE ENGINE; INTERFACE; PRODUCTION MANAGEMENT;
D O I
10.1016/0166-3615(92)90012-C
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Both simulation and expert systems are computer-based modern management decision supporting techniques. In this paper, an expert simulation system for the master production schedule (ESSMPS) is presented. By integrating expert system, simulation, mathematical optimization and data base techniques, ESSMPS has been developed on an IBM PC using PC Plus expert system building tool, SIMAN simulation language, FORTRAN 77 and dBASE III Plus to help the production manager to work out a satisfactory master production schedule.
引用
收藏
页码:127 / 133
页数:7
相关论文
共 50 条
  • [1] DETERMINING THE MASTER PRODUCTION SCHEDULE
    OGRADY, PJ
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1982, 33 (07) : 658 - 658
  • [2] A production rescheduling expert simulation system
    Li, H
    Li, ZC
    Li, LX
    Hu, B
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 124 (02) : 283 - 293
  • [3] An expert simulation system for production rescheduling
    Hu, B
    Li, ZC
    [J]. 98 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, PROCEEDINGS, 1998, : 3 - 7
  • [4] ORDER PROMISING AND THE MASTER PRODUCTION SCHEDULE
    MCCLELLAND, MK
    [J]. DECISION SCIENCES, 1988, 19 (04) : 858 - 879
  • [5] SCHEDULE ADVISEMENT EXPERT SYSTEM
    KOWALSKI, K
    EALY, D
    [J]. COMPUTERS & EDUCATION, 1991, 17 (04) : 259 - 265
  • [6] Study on Master Production Schedule in Manufacturing System for Medium and Small Manufacture Enterprises
    Lu, Xiaohong
    Wu, Wenyi
    Han, Pengzhuo
    Li, Guangjun
    Wei, Jie
    [J]. ADVANCED RESEARCH ON APPLIED MECHANICS AND MANUFACTURING SYSTEM, 2013, 252 : 349 - +
  • [7] Clustering Based Heuristics for Aligning Master Production Schedule and Delivery Schedule
    Astanti, Ririn Diar
    Ai, The Jin
    [J]. MANAGEMENT SYSTEMS IN PRODUCTION ENGINEERING, 2024, 32 (03) : 401 - 408
  • [8] Crop Irrigation Schedule Expert System
    Hazman, Maryam
    [J]. 2015 13TH INTERNATIONAL CONFERENCE ON ICT AND KNOWLEDGE ENGINEERING (ICT & KNOWLEDGE ENGINEERING 2015), 2015, : 78 - 83
  • [9] Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
    Koulinas, Georgios K.
    Xanthopoulos, Alexandros S.
    Tsilipiras, Thomas T.
    Koulouriotis, Dimitrios E.
    [J]. BUILDINGS, 2020, 10 (08)
  • [10] FREEZING THE MASTER PRODUCTION SCHEDULE - IMPLICATIONS FOR FILL RATE
    SRIDHARAN, V
    LAFORGE, RL
    [J]. DECISION SCIENCES, 1994, 25 (03) : 461 - 469