COMMISSIONING UNIT-4 OF THE BALACHOVO NUCLEAR-POWER STATION

被引:0
|
作者
IPATOV, P [1 ]
DISTLER, K [1 ]
KEMMETER, H [1 ]
机构
[1] RWE ENERGIE AKTIENGESELL,D-68643 BIBLIS,GERMANY
来源
ATOMWIRTSCHAFT-ATOMTECHNIK | 1994年 / 39卷 / 04期
关键词
D O I
暂无
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
When unit 4 Of the Russian Balachovo Nuclear Power Station, equipped with a type VVER-1000 pressurized Water reactor, was commissioned in March 1993, delegations from Biblis were present a, consultants. The safety design of the reactor is based largely on West European criteria. Commissioning was supervised by a state commission. The Commissioning procedure included functioning and startup tests of the subsystems of the Plant. tests of the containment strength, revisions Of components and systems, and a physical and an energetic startup. Experiments performed after first critically had been reached demonstrated that performance data were in line with project requirements.
引用
收藏
页码:290 / 293
页数:4
相关论文
共 50 条
  • [1] COMMISSIONING OF UNIT A OF BIBLIS NUCLEAR-POWER STATION
    RITTER, M
    WIENKEN, P
    [J]. KERNTECHNIK, 1975, 17 (04) : 168 - 177
  • [2] COMMISSIONING OF UNIT-A OF BIBLIS NUCLEAR-POWER STATION
    RITTER, M
    WIENKEN, P
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1975, 20 (233): : 615 - 617
  • [3] COMMISSIONING TESTS IN A NUCLEAR-POWER STATION
    GUBSER, HR
    BROM, B
    WEEHUIZEN, F
    TROSCH, R
    [J]. BROWN BOVERI REVIEW, 1973, 60 (06): : 278 - 286
  • [4] COMMISSIONING THE MULHEIM-KARLICH NUCLEAR-POWER STATION
    BUCHWALD, K
    WIRTZ, P
    [J]. BROWN BOVERI REVIEW, 1987, 74 (04): : 187 - 198
  • [5] COMMISSIONING OF BRUCE-A NUCLEAR-POWER STATION UNDER WAY
    不详
    [J]. NUCLEAR ENGINEERING INTERNATIONAL, 1976, 21 (244): : 58 - 63
  • [6] THE REACTOR DIAGNOSTICS SYSTEM INSTALLED AT THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO LEUSCHNER UNIT-3 AND UNIT-4
    ZIEGENBEIN, D
    SEIDLER, S
    HESSEL, G
    HEYER, J
    [J]. KERNENERGIE, 1982, 25 (03): : 102 - 105
  • [7] RESULTS OF TEST RUNS FOR STUDYING THE DYNAMICS OF THE UNIT-3 AND UNIT-4 OF THE GREIFSWALD NUCLEAR-POWER PLANT BRUNO LEUSCHNER
    RICHTER, R
    MATTHES, H
    MENDE, J
    PABST, L
    [J]. KERNENERGIE, 1980, 23 (08): : 302 - 307
  • [8] RADIATION ENVIRONMENT DURING THE COMMISSIONING AND POWER RUNUP IN THE 5TH UNIT AT THE NOVYI-VORONEZH NUCLEAR-POWER STATION
    VERKHOVETSKII, NA
    IVANNIKOV, VP
    KOZLOV, VF
    KRUGLOV, VP
    LUZANOVA, LM
    POCEVIN, AT
    SLAVYAGIN, PD
    KHAMYANOV, LP
    [J]. SOVIET ATOMIC ENERGY, 1982, 53 (06): : 825 - 827
  • [9] CONSTRUCTION, COMMISSIONING AND OPERATION OF THE V-1 NUCLEAR-POWER STATION IN CZECHOSLOVAKIA
    RUSNAK, M
    NOVAK, S
    [J]. JADERNA ENERGIE, 1982, 28 (12): : 429 - 434
  • [10] SPANISH NUCLEAR-POWER STATION COMMISSIONING - CLOSING OF THE TECHNOLOGY-TRANSFER CYCLE
    MONTES, JL
    [J]. TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1982, 42 : 60 - 61