IMPLEMENTATION OF HYBRID SHORT-TERM LOAD FORECASTING SYSTEM USING ARTIFICIAL NEURAL NETWORKS AND FUZZY EXPERT-SYSTEMS

被引:136
|
作者
KIM, KH
PARK, JK
HWANG, KJ
KIM, SH
机构
[1] SEOUL NATL UNIV,DEPT ELECT ENGN,SEOUL 151742,SOUTH KOREA
[2] UNIV ULSAN,DEPT ELECT ENGN,ULSAN 680749,SOUTH KOREA
[3] KOREA ELECT POWER CO,DEPT POWER SYST CONTROL,SEOUL 135791,SOUTH KOREA
关键词
D O I
10.1109/59.466492
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, a hybrid model for short-term load forecast that integrates artificial neural networks and fuzzy expert systems is presented. The forecasted load is obtained by passing through two steps. In the first procedure, the artificial neural networks are trained with the load patterns corresponding to the forecasting hour, and the provisional forecasted load is obtained by the trained artificial neural networks. In the second procedure, the fuzzy expert systems modify the provisional forecasted load considering the possibility of load variation due to changes in temperature and the load behavior of holiday. In the test case of 1994 for implementation in short term load forecasting expert system of Korea Electric Power Corporation (KEPCO), the proposed hybrid model provided good forecasting accuracy of the mean absolute percentage errors below 1.3%. The comparison results with exponential smoothing method showed the efficiency and accuracy of the hybrid model.
引用
收藏
页码:1534 / 1539
页数:6
相关论文
共 50 条
  • [21] Development of a hybrid system based on neural networks and expert systems for short-term electricity demand forecasting
    Basoglu, Benan
    Bulut, Mehmet
    [J]. JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2017, 32 (02): : 575 - 583
  • [22] SHORT-TERM LOAD FORECASTING USING NEURAL NETWORKS
    KIARTZIS, SJ
    BAKIRTZIS, AG
    PETRIDIS, V
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 1995, 33 (01) : 1 - 6
  • [23] Implementation of short-term load forecasting expert systems in a real environment
    Kim, KH
    Park, JK
    Hwang, KJ
    Kim, SH
    Han, HG
    Kang, SH
    [J]. ENGINEERING INTELLIGENT SYSTEMS FOR ELECTRICAL ENGINEERING AND COMMUNICATIONS, 2000, 8 (03): : 139 - 144
  • [24] Short-term load forecasting with artificial neural network and fuzzy logic
    Ma, WX
    Bai, XM
    Mu, LS
    [J]. POWERCON 2002: INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY, VOLS 1-4, PROCEEDINGS, 2002, : 1101 - 1104
  • [25] Short term load forecasting using Artificial Neural Networks
    Sinha, AK
    [J]. PROCEEDINGS OF IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY 2000, VOLS 1 AND 2, 2000, : 548 - 553
  • [26] Short-term load forecasting using Fuzzy Neural Network
    Shao, S
    Sun, YM
    [J]. FOURTH INTERNATIONAL CONFERENCE ON ADVANCES IN POWER SYSTEM CONTROL, OPERATION & MANAGEMENT, VOLS 1 AND 2, 1997, : 131 - 134
  • [27] Short-Term Load Forecasting Using Artificial Neural Network
    Buhari, Muhammad
    Adamu, Sanusi Sani
    [J]. INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, IMECS 2012, VOL I, 2012, : 83 - 88
  • [28] SHORT-TERM LOAD FORECASTING USING AN ARTIFICIAL NEURAL NETWORK
    LEE, KY
    CHA, YT
    PARK, JH
    KURZYN, MS
    PARK, DC
    MOHAMMED, OA
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (01) : 124 - 132
  • [29] Short-Term Load Forecasting Using Hybrid ARIMA and Artificial Neural Network Model
    Singhal, Rahul
    Choudhary, Niraj Kumar
    Singh, Nitin
    [J]. ADVANCES IN VLSI, COMMUNICATION, AND SIGNAL PROCESSING, 2020, 587 : 935 - 947
  • [30] Short-Term Load Forecasting for Microgrids Based on Artificial Neural Networks
    Hernandez, Luis
    Baladron, Carlos
    Aguiar, Javier M.
    Carro, Belen
    Sanchez-Esguevillas, Antonio J.
    Lloret, Jaime
    [J]. ENERGIES, 2013, 6 (03) : 1385 - 1408