共 50 条
- [21] MODERNIZING LOW-CAPACITY ELECTRIC-ARC STEELMAKING FURNACES [J]. METALLURGIST, 1978, 22 (7-8) : 531 - 532
- [22] USE OF PRE-REUCED IRON PELLETS FOR STEELMAKING IN ELECTRIC FURNACES [J]. JOURNAL OF THE IRON AND STEEL INSTITUTE, 1970, 208 : 529 - &
- [23] BEHAVIOR OF IRON-OXIDES CONTAINED IN FEEDSTOCK FOR ELECTRIC STEELMAKING FURNACES [J]. STEEL IN THE USSR, 1986, 16 (05): : 234 - 236
- [24] ALTERATION PROFILES IN ROOFS AND SIDEWALLS OF MODERN ELECTRIC ARC STEELMAKING FURNACES [J]. AMERICAN CERAMIC SOCIETY BULLETIN, 1971, 50 (04): : 431 - &
- [26] Next-Generation Electric Arc Furnaces as a Steelmaking Modernization Factor [J]. RUSSIAN METALLURGY, 2007, (07): : 552 - 559
- [27] An effect of heat insulation parameters on thermal losses of water-cooled roofs for secondary steelmaking electric arc furnaces [J]. FRATTURA ED INTEGRITA STRUTTURALE, 2016, Gruppo Italiano Frattura (37): : 297 - 304
- [29] THERMAL EFFECT OF ELECTRIC-ARCS ON RAMMED LININGS IN ELECTRIC-ARC STEELMAKING FURNACES [J]. STEEL IN THE USSR, 1988, 18 (07): : 334 - 336
- [30] CONVERSION OF ARC STEELMAKING FURNACES INTO PLASMA FURNACES [J]. METALLURGIST, 1988, 32 (7-8) : 266 - 267