共 43 条
- [21] Developing a Two-Stage Supply Chain Model using a Discrete Time Markov Chain Model during Supply Chain Disruptions INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2023, 22 (04): : 449 - 462
- [23] COST-BENEFIT-ANALYSIS OF A SINGLE-SERVER 3-UNIT REDUNDANT SYSTEM WITH INSPECTION, DELAYED REPLACEMENT AND 2 TYPES OF REPAIR MICROELECTRONICS AND RELIABILITY, 1986, 26 (02): : 247 - 253
- [24] Effectiveness Analysis of Two Non Identical Unit System Model with Priority Unit Subject to Degradation and Inspection Facility PROCEEDINGS OF 2019 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND KNOWLEDGE ECONOMY (ICCIKE' 2019), 2019, : 40 - 45
- [25] BAYESIAN STUDY OF A CONTINUOUS PARAMETRIC MARKOV CHAIN MODEL OF A THREE IDENTICAL UNIT COLD STANDBY SYSTEM WITH RANDOM SHOCKS INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICAL SCIENCES, 2023, 19 (01): : 341 - 352
- [28] Analysis of a two-unit automatic power factor controller system with priority to inspection over repair/replacement Jain, Roosel (rooseljain@gmail.com), 1600, Inderscience Publishers, 29, route de Pre-Bois, Case Postale 856, CH-1215 Geneva 15, CH-1215, Switzerland (08): : 425 - 436
- [29] A discrete replacement model for a two-unit parallel system subject to failure rate interaction Quality and Quantity, 2009, 43 : 471 - 479