The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance

被引:23
|
作者
Zailani, Suhaiza [1 ]
Ariffin, Hazrina Aziz Md. [1 ]
Iranmanesh, Mohammad [2 ]
Moeinzadeh, Soroush [3 ]
Iranmanesh, Masoomeh [4 ]
机构
[1] Univ Malaya, Fac Business & Accountancy, Kuala Lumpur, Malaysia
[2] Malaysia Univ Sci & Technol, Petaling Jaya, Malaysia
[3] Univ Sains Malaysia, Sch Management, George Town, Malaysia
[4] Islamic Azad Univ, Kerman Branch, Dept Art & Architecture, Kerman, Iran
关键词
Malaysia; Construction; Project performance; Delay factors; Project risk mitigation;
D O I
10.1108/JSTPM-12-2015-0041
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - This paper aims to explore the relationship between delay factors and construction project performance with respect to project risk mitigation strategies as moderators. Design/methodology/approach - Random sampling was used to select the sample of the study. Data were gathered through a survey of 204 Malaysian construction companies. The data were analysed using the partial least squares technique. Findings - The results indicate that environmental, resource and coordination issues negatively affect construction project performance. Project visibility and flexibility can mitigate the negative effects of both resource and coordination issues on project performance. Furthermore, supplier development can mitigate the negative effects of coordination issues. Practical implications - The findings of the study will be useful for construction firms to complete construction projects timely, within a scheduled budget and with only minor defects if adopted. Originality/value - This study is among the first to empirically test the moderating role of risk mitigation strategies on the relationship between delay factors and project performance in the construction industry.
引用
收藏
页码:346 / 368
页数:23
相关论文
共 50 条
  • [21] The relationship between anger and learning from failure: The moderating effect of resilience and project commitment
    Wang, Wenzhou
    Chen, Xiaoxuan
    Ning, Gengmiao
    Wang, Yijie
    Song, Shanghao
    CURRENT PSYCHOLOGY, 2023, 42 (26) : 22726 - 22737
  • [22] The relationship between anger and learning from failure: The moderating effect of resilience and project commitment
    Wenzhou Wang
    Xiaoxuan Chen
    Gengmiao Ning
    Yijie Wang
    Shanghao Song
    Current Psychology, 2023, 42 : 22726 - 22737
  • [23] AN ANALYSIS OF THE LINKS BETWEEN PROJECT SUCCESS FACTORS AND PROJECT PERFORMANCE
    Ozdemir Gungor, Dilek
    Gozlu, Sitki
    SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2016, 34 (02): : 223 - 239
  • [24] MitC: Open-source software for construction project control and delay mitigation
    Kammouh, Omar
    Kok, M. W. A.
    Nogal, Maria
    Binnekamp, Ruud
    Wolfert, A. R. M.
    SOFTWAREX, 2022, 18
  • [25] Delay Factors in Building Construction Project of State Elementary School
    Haryo, Raden Risang C. D.
    Mulyadi, Lalu
    Iskandar, Tiong
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2020, 6 (03): : 523 - 530
  • [26] INVESTIGATING FACTORS OF DELAY IN IBS CONSTRUCTION PROJECT: MANUFACTURER PERSPECTIVES
    Nawi, Mohd Nasrun Mohd
    Nasir, Najuwa Mohd
    Azman, Mohamed Nor Azhari
    Jumintono
    Khairudin, Moh
    JOURNAL OF ENGINEERING SCIENCE AND TECHNOLOGY, 2019, 14 : 59 - 66
  • [27] PROJECT DELAY: KEY ELECTRICAL CONSTRUCTION FACTORS IN HONG KONG
    Chiu, Betty W. Y.
    Lai, Joseph H. K.
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (07) : 847 - 857
  • [28] Assessing Construction Constraint Factors on Project Performance in the Construction Industry
    Masoetsa, Tshweu Given
    Ogunbayo, Babatunde Fatai
    Aigbavboa, Clinton Ohis
    Awuzie, Bankole Osita
    BUILDINGS, 2022, 12 (08)
  • [29] The utilization of project risk monitoring and control practices and their relationship with project success in construction projects
    Obondi, Kennedy Christopher
    JOURNAL OF PROJECT MANAGEMENT, 2022, 7 (01) : 35 - 52
  • [30] Assessment of the effect of external risk factors on the success of an oil and gas construction project
    Kassem, Mukhtar
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (09) : 2767 - 2793