This paper considers the problem of due-date assignment and sequencing of n stochastically independent jobs with random processing times on a single machine. The objective is to find the optimal due-dates, under the slack due-date assignment method, and the optimal job sequence that jointly minimize the expected total cost. This cost is a function of the length of the assigned due-dates and the deviations of job completion times from the due-dates. It is shown that the optimal due-dates can be analytically determined. An efficient algorithm of the order O(n log n) is developed to find the optimal job sequence under mild conditions. It is also shown that, with further suitable and reasonable assumptions, the job sequence in the shortest expected processing time order is optimal.
机构:
Chongqing Normal Univ, Coll Math Sci, Chongqing, Peoples R China
Chongqing Normal Univ, Sch Math Sci, Key Lab OCME, Chongqing, Peoples R ChinaChongqing Normal Univ, Coll Math Sci, Chongqing, Peoples R China
Zhang, Xin-Gong
Bai, Dan-Yu
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Normal Univ, Sch Math Sci, Key Lab OCME, Chongqing, Peoples R China
Dalian Maritime Univ, Coll Management, Dalian, Peoples R ChinaChongqing Normal Univ, Coll Math Sci, Chongqing, Peoples R China
Bai, Dan-Yu
Lin, Win-Chin
论文数: 0引用数: 0
h-index: 0
机构:
Feng Chia Univ, Dept Stat, Taichung, TaiwanChongqing Normal Univ, Coll Math Sci, Chongqing, Peoples R China
Lin, Win-Chin
Cheng, Shuenn-Ren
论文数: 0引用数: 0
h-index: 0
机构:
Cheng Shiu Univ, Dept Business Adm, Kaohsiung, TaiwanChongqing Normal Univ, Coll Math Sci, Chongqing, Peoples R China