Spanning the River Rhine with a new cable-stayed bridge

被引:0
|
作者
Lockmann, Hans [1 ]
Marzahn, Gero A. [2 ]
机构
[1] Wesel Off, North Rhine West Phalia Highways Dept, Lower Rhine Reg Branch, Gelsenkirchen, Germany
[2] North Rhine West Phalia Highways Dept, D-45888 Gelsenkirchen, Germany
来源
关键词
road bridge; asymmetric; orthotropic plate; incremental launching; cable-stayed bridge; tender design; final design;
D O I
10.1002/stco.200910002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper reports on the design and construction of the new bridge over the River Rhine being built near the cities of Wesel and Buderich, Germany, the "Niederrheinbrucke". The paper outlines the design and bidding process as well as the construction of the new bridge, which will be the longest cable-stayed bridge in Germany. The new Rhine crossing is only the second cable-stayed bridge in Germany to use parallel strands (Suspa DSI) rather than steel wire ropes (locked coil ropes) and contributes to a new generation of cable-stayed bridges in Germany.
引用
收藏
页码:9 / +
页数:6
相关论文
共 50 条
  • [31] Disproportionate collapse of a cable-stayed bridge
    Domaneschi, Marco
    Cimellaro, Gian Paolo
    Scutiero, Gianluca
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (01) : 13 - 26
  • [32] Modal Analysis of a Cable-stayed Bridge
    Wei, Liuchuang
    Cheng, Heming
    Li, Jianyun
    INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 481 - 486
  • [33] Basarab Cable-Stayed Bridge in Bucharest
    Manterola Armisen, Javier
    Martinez Cutillas, Antonio
    Fuente Garcia, Silvia
    STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (03) : 392 - 395
  • [34] Racing to erect cable-stayed bridge over Tagus River in Portugal
    ENR (Engineering News-Record), 1994, 232 (18):
  • [35] A landmark cable-stayed bridge over the Charles River, Boston, Massachusetts
    Chandra, Vijay
    Ricci, Anthony L.
    Donington, Keith
    Civil Engineering Practice, 2003, 18 (02): : 53 - 68
  • [36] Modal identification of a cable-stayed bridge
    Yen, WHP
    Baber, TT
    Barton, FW
    ENGINEERING MECHANICS: PROCEEDINGS OF THE 11TH CONFERENCE, VOLS 1 AND 2, 1996, : 600 - 603
  • [37] FOUNDATIONS OF THE ANNACIS CABLE-STAYED BRIDGE
    BAZETT, DJ
    MCCAMMON, NR
    CANADIAN GEOTECHNICAL JOURNAL, 1986, 23 (04) : 458 - 471
  • [38] Resilience evaluation of a cable-stayed bridge
    Gil, H.
    Han, K.
    Sea, S.
    Park, J.
    MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 2133 - 2137
  • [39] Structural assessment of a cable-stayed bridge
    Hemez, FM
    Sohn, H
    PROCEEDINGS OF IMAC-XX: STRUCTURAL DYNAMICS VOLS I AND II, 2002, 4753 : 1105 - 1112
  • [40] TENTATIVE RECOMMENDATIONS FOR CABLE-STAYED BRIDGE STRUCTURES AND COMMENTARY ON TENTATIVE RECOMMENDATIONS FOR CABLE-STAYED BRIDGE STRUCTURES - CLOSURE
    不详
    JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1978, 104 (11): : 1801 - 1802