A single-machine bicriterion scheduling problem with setup times

被引:1
|
作者
Lee, Wen-Chiung [1 ]
Wu, Chin-Chia [1 ]
机构
[1] Feng Chia Univ, Dept Stat, 100 Wenhwa Rd, Taichung 407, Taiwan
来源
关键词
Single machine; sequence-independent setup time; total completion time; maximum tardiness;
D O I
10.1080/09720510.2005.10701179
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
This paper addresses a single-machine bi-criterion scheduling problem where the jobs fall into several classes. A sequence-independent setup time is required when the process is switched from one class of jobs to another. The objective of this paper is to find an optimal schedule that minimizes the total completion time subject to a constraint that each job must finish before its deadline. An exact solution incorporating with a number of properties and a lower bound are proposed to tackle this problem, and the efficiency of the proposed procedure is then tested by computational experiments.
引用
收藏
页码:559 / 568
页数:10
相关论文
共 50 条
  • [11] Single machine scheduling problem with family setup times
    Liu, Zheng-Gang
    Wang, Dao-Ping
    Jin, Feng
    Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2009, 31 (10): : 1347 - 1350
  • [12] ROLLING HORIZON ALGORITHMS FOR A SINGLE-MACHINE DYNAMIC SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES
    OVACIK, IM
    UZSOY, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (06) : 1243 - 1263
  • [13] Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times
    Nesello, Vitor
    Subramanian, Anand
    Battarra, Maria
    Laporte, Gilbert
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (02) : 498 - 507
  • [14] A single-machine learning effect scheduling problem with release times
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Hsu, Peng-Hsiang
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2010, 38 (1-2): : 3 - 11
  • [15] Single-machine scheduling with release dates, due dates and family setup times
    Schutten, JMJ
    vandeVelde, SL
    Zijm, WHM
    MANAGEMENT SCIENCE, 1996, 42 (08) : 1165 - 1174
  • [16] Single-machine scheduling problems with past-sequence-dependent setup times
    Koulamas, Christos
    Kyparisis, George J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 1045 - 1049
  • [17] Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Huang, Yi-Chi
    Lee, Wen-Chiung
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (12) : 1760 - 1765
  • [18] Genetic Algorithm for single machine scheduling problem with setup times
    OuYang, Quan
    Xu, HongYun
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1678 - 1681
  • [19] AN APPROXIMATION ALGORITHM FOR A SINGLE-MACHINE SCHEDULING PROBLEM WITH RELEASE TIMES AND DELIVERY TIMES
    NOWICKI, E
    SMUTNICKI, C
    DISCRETE APPLIED MATHEMATICS, 1994, 48 (01) : 69 - 79