共 50 条
- [31] CONSTRUCTION STATUS OF THE THTR TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 31 (MAY): : 21 - 22
- [32] Design of data acquisition system in nuclear power station Hedongli Gongcheng/Nuclear Power Engineering, 2006, 27 (04): : 93 - 96
- [34] ENVIRONMENTAL CONSIDERATIONS IN SITING, CONSTRUCTION, AND OPERATION OF A NUCLEAR-POWER STATION TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 21 : 15 - 15
- [35] BROKDORF NUCLEAR-POWER STATION - CONSTRUCTION SCHEDULING AND DEADLINE CONTROL ATOMWIRTSCHAFT-ATOMTECHNIK, 1986, 31 (8-9): : 428 - 430
- [36] CONSTRUCTION OF REACTOR CORE AND OF FUEL ELEMEMENTS IN OBRIGHEIM NUCLEAR POWER STATION ATOM & STROM, 1967, 13 (11-1): : 144 - &
- [37] Management self-assessment in construction phase of nuclear power station Hedongli Gongcheng/Nuclear Power Engineering, 2004, 25 (03): : 284 - 288
- [38] CONSTRUCTION OF UNIT-2 OF THE PHILIPPSBURG NUCLEAR-POWER STATION ATOMWIRTSCHAFT-ATOMTECHNIK, 1985, 30 (02): : 70 - 79
- [39] Civil engineering design and construction of Yueyang power station, China PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MARITIME AND ENERGY, 1996, 118 (02): : 121 - 130
- [40] PUN - THE ITALIAN STANDARD NUCLEAR-POWER STATION DESIGN TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1984, 47 : 358 - 359