共 50 条
- [21] REPORT ON THE MAMOU FIELD PRESSURE MAINTENANCE PROJECT [J]. TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1951, 192 : 263 - 268
- [22] PRESSURE MAINTENANCE BY INSITU COMBUSTION, WEST HEIDELBERG UNIT, JASPER-COUNTY, MISSISSIPPI [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1983, 35 (11): : 1877 - 1883
- [23] SIMULATION OF A PARTIAL PRESSURE MAINTENANCE GAS CYCLING PROJECT WITH A COMPOSITIONAL MODEL, CARSON CREEK FIELD, ALBERTA [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1969, 21 (SEP): : 1085 - &
- [24] PRESSURE FLUCTUATION IN BOTTOM REGION WITH GAS INJECTION [J]. DOPOVIDI AKADEMII NAUK UKRAINSKOI RSR SERIYA A-FIZIKO-MATEMATICHNI TA TECHNICHNI NAUKI, 1973, (NOV): : 1015 - 1017
- [25] INJECTION OF GAS INTO HIGH-PRESSURE DEVICES [J]. INSTRUMENTS AND EXPERIMENTAL TECHNIQUES, 1982, 25 (01) : 260 - 261
- [26] LOW-PRESSURE GAS INJECTION IN GC [J]. JOURNAL OF CHROMATOGRAPHIC SCIENCE, 1982, 20 (06) : 283 - 285
- [27] A investigation of fuzzy control for gas-injection pressure in gas-assisted injection molding [J]. ICIEA 2007: 2ND IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, VOLS 1-4, PROCEEDINGS, 2007, : 153 - 158
- [28] RESULTS OF GAS INJECTION IN THE CEDAR LAKE FIELD [J]. TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1951, 192 : 357 - 366
- [29] DEVICE FOR LOW-PRESSURE GAS INJECTION IN GAS-CHROMATOGRAPHY [J]. JOURNAL OF CHROMATOGRAPHY, 1974, 94 (JUL17): : 276 - 278
- [30] DETERMINING THE MOST PROFITABLE GAS INJECTION PRESSURE FOR A GAS LIFT INSTALLATION [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1984, 36 (09): : 1305 - 1311