On Design and Construction of Pile Group Foundation of Taipei 101

被引:0
|
作者
Yu, Ching-Han [1 ]
机构
[1] Sino Geotechnol Inc, Taipei, Taiwan
来源
GEOTECHNICAL ENGINEERING | 2011年 / 42卷 / 02期
关键词
Pile load test; Performance-based design; Pile Group; Creep behavior of pile; Pile bottom cleaning and post-grouting;
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The evenly distributed cast-in-place reinforced concrete group piles with socketed length into soft bedrock of 15 to 33 m were designed as the foundation for Taipei 101. The high-rise building is extremely sensitive to the foundation settlement. Besides, the bearing behavior of a cast-in-place bored pile is largely determined by the way it was installed. Accordingly, the design of pile group foundation for Taipei 101 was based on a series of full scale pile trial installation as well as comprehensive instrumented pile load tests with compressive and pull-out load up to 40 MN and 22 MN respectively. The characteristic t-z curve for each subsurface stratum was evaluated and used to predict the pile load-settlement behavior for the specific soil stratification of each pile located, thus each pile length was determined according to the anticipated loads during service. Besides, the pile group effects, including bearing capacity reduction and settlement increase, were considered in the foundation design. The creep behaviors for piles embedded into bedrock were also analyzed by using the measured results of pile load tests. The superstructures, basement, mat, piles and retaining diaphragm walls were modeled into one integral system for the structural design of foundation, thus the estimation of foundation behavior under various load combinations were conducted using the above mentioned model with the sub-grade reaction under foundation mat. Based on the investigation of trial installations, the construction specification was proposed for the installation of reverse circulation piles. For piles under the main tower, the measures of bottom cleaning and post-grouting were employed to improve the pile bottom sediments and increase end bearing capacity. Both the conventional static and STATNAMIC dynamic loading tests were employed to verify the bearing capacities and behaviors of production piles. Results of the proof load tests met the design requirements well as compared with the simulation using pile ultimate load test results.
引用
收藏
页码:56 / 69
页数:14
相关论文
共 50 条
  • [31] Analysis on Post-construction Settlement of Pile Group Foundation and Load Monitoring for Dazhangcun Grand Bridge
    Su Huifeng
    Liu Fuchun
    Wang Enxu
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2095 - +
  • [32] Study on the settlement control of pile group foundation by using pile shaft grouting
    Zou, Li
    Wu, Xingxu
    Ma, Jianlin
    Zhongguo Tiedao Kexue/China Railway Science, 2010, 31 (01): : 16 - 20
  • [33] Application of extended end composite pile design in pile foundation work
    Kim, Seungho
    Whang, Seoung-Wook
    Kim, Sangyong
    Hyung, Won Gil
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2017, 170 (05) : 455 - 465
  • [34] Design and analysis of pile foundation of a mansion in Hangzhou
    Geng, Cui-Zhen
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2011, 33 (SUPPL. 2): : 417 - 421
  • [35] Optimum Design of Pile Raft Foundation on Pile-soil Interaction
    Wu, Sujuan
    Xiong, Zhongming
    Xu, Yuangang
    PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 497 - 500
  • [36] Development of expert systems for pile foundation design
    Wong, K.C.
    Poulos, H.G.
    Thorne, C.P.
    Transactions of the Institution of Engineers, Australia. Civil engineering, 1991, CE33 (02): : 119 - 127
  • [37] Pile foundation design using microsoft excel
    Canakci, Hanifi
    COMPUTER APPLICATIONS IN ENGINEERING EDUCATION, 2008, 15 (04) : 355 - 366
  • [38] Settlement monitoring system of pile-group foundation
    Zhi-jian Chen
    Ning-ning Zhang
    Xiong-wen Zhang
    Journal of Central South University of Technology, 2011, 18 : 2122 - 2130
  • [39] Some problems on settlement calculation of pile group foundation
    Qiu, Ren-Dong
    Liu, Jin-Li
    Gao, Wen-Sheng
    Qiu, Ming-Bing
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2011, 33 (SUPPL. 2): : 15 - 23
  • [40] Seismic retrofit of pile group foundation with thickened caps
    Wang, Edward
    Open Construction and Building Technology Journal, 2015, 9 (01): : 248 - 254