Kanban-controlled exponential production lines: analysis and design

被引:3
|
作者
Zhang, Liang [1 ]
机构
[1] Univ Wisconsin Milwaukee, Dept Ind & Mfg Engn, Milwaukee, WI 53211 USA
基金
美国国家科学基金会;
关键词
Pull production system; Exponential line; Kanban; Performance analysis; Lean design; Lean production;
D O I
10.1108/17410381311318873
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The purpose of this paper is to study kanban-controlled pull-systems with machines having the exponential reliability model and with buffers finite capacities. Design/methodology/approach - Using Markovian analysis closed formulas are derived for the performance metrics such as customer service level, average inventory level, and throttling of raw part release, for one-machine systems. Then, a recursive procedure is developed to extend the performance evaluation technique to multi-machine systems. Findings - Once system-theoretic properties of the systems under consideration are investigated, the paper reveals methods for evaluating the smallest, i.e. lean, number of kanbans that ensure the desired level of customer service which are developed. Originality/value - Production systems can operate in either push or pull regime. The push-systems have been analyzed extensively for over 50 years, while the pull-systems have been studied to a much lesser extent.
引用
收藏
页码:358 / 383
页数:26
相关论文
共 50 条
  • [31] Determination of Number of Kanban for Classis Control System Production Lines
    Mao, Fangyan
    Yang, HongBing
    Xu, Junhao
    2014 IEEE 11TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2014, : 480 - 483
  • [32] QUEUING MODELS OF KANBAN AND MRP CONTROLLED PRODUCTION SYSTEMS
    BUZACOTT, JA
    ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 17 (1-4): : 3 - 20
  • [33] Performance analysis of single stage kanban controlled production systems using parametric decomposition
    Ananth Krishnamurthy
    Rajan Suri
    Queueing Systems, 2006, 54 : 141 - 162
  • [34] Performance analysis of single stage kanban controlled production systems using parametric decomposition
    Krishnamurthy, Ananth
    Suri, Rajan
    QUEUEING SYSTEMS, 2006, 54 (02) : 141 - 162
  • [35] Design and analysis of production control scheme for Kanban-based JIT environment
    Al-Tahat, Mohammad D.
    Mukattash, Adnan M.
    JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS, 2006, 343 (4-5): : 521 - 531
  • [36] Analysis of exponential reliable production lines using Kronecker descriptors
    Fernandes, P.
    O'Kelly, M. E. J.
    Papadopoulos, C. T.
    Sales, A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (14) : 4240 - 4257
  • [37] Production Lead Time in Exponential Serial Lines: Analysis and Control
    Meerkov, Semyon M.
    Yan, Chao-Bo
    2014 IEEE 53RD ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2014, : 4887 - 4892
  • [38] COMPUTER SUPPORTED DESIGN OF KANBAN CONTROLLED PRODUCTION INTEGRATED SYSTEM-ANALYSIS AND SIMULATION WITH HIGHER-ORDER PETRI NETS
    ITTER, F
    RELEWICZ, C
    LECTURE NOTES IN COMPUTER SCIENCE, 1991, 524 : 188 - 204
  • [39] SIMULATION AND DESIGN OF A DUAL-KANBAN PRODUCTION SYSTEM
    POTTS, BK
    TREVINO, J
    COMPUTERS & INDUSTRIAL ENGINEERING, 1989, 17 : 430 - 435
  • [40] Analytical method for performance evaluation of kanban controlled production systems
    Di Mascolo, Maria
    Frein, Yannick
    Dallery, Yves
    Operations Research, 44 (01): : 50 - 64