PLANNING AND SCHEDULING IN AN FMS

被引:2
|
作者
AANEN, E
GAALMAN, GJ
NAWIJN, WM
机构
来源
关键词
D O I
10.1016/0167-188X(89)90059-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:89 / 97
页数:9
相关论文
共 50 条
  • [31] On deadlock-free scheduling in FMS
    Ben Abdallah, I
    ElMekkawy, T
    ElMaraghy, HA
    1998 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5, 1998, : 366 - 371
  • [32] Research on Key Issues of Scheduling in FMS
    徐常胜
    HighTechnologyLetters, 1995, (02) : 16 - 19
  • [33] A NOVAL METHOD OF WORKSHOP SCHEDULING IN FMS
    YANG, WY
    WU, QD
    LI, TJ
    IFIP TRANSACTIONS B-APPLICATIONS IN TECHNOLOGY, 1992, 3 : 711 - 720
  • [34] CLASSIFICATION AND REVIEW OF FMS SCHEDULING PROCEDURES
    RACHAMADUGU, R
    STECKE, KE
    PRODUCTION PLANNING & CONTROL, 1994, 5 (01) : 2 - 20
  • [35] Real time fuzzy scheduling rules in FMS
    Felix T. S. Chan
    H. K. Chan
    A. Kazerooni
    Journal of Intelligent Manufacturing, 2003, 14 : 341 - 350
  • [36] INTELLIGENT HEURISTIC FOR FMS SCHEDULING USING GROUPING
    BENARIEH, D
    DROR, M
    JOURNAL OF INTELLIGENT MANUFACTURING, 1991, 2 (06) : 387 - 395
  • [37] Scheduling of FMS - Application of an open optimization system
    Weigert, G
    Hampel, D
    Sauer, W
    FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, 1998, 1998, : 771 - 780
  • [38] A scheduling analysis in FMS using the transitive matrix
    Lee, JK
    ARTIFICIAL INTELLIGENCE AND SIMULATION, 2004, 3397 : 167 - 178
  • [39] Planning the reliability growth test of FMS
    Dang, XL
    Li, DQ
    Wu, XY
    Sha, JC
    FIFTH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGMENT SCIENCE: PROCEEDINGS OF IE & MS '98, 1998, : 487 - 490
  • [40] Real time fuzzy scheduling rules in FMS
    Chan, FTS
    Chan, HK
    Kazerooni, A
    JOURNAL OF INTELLIGENT MANUFACTURING, 2003, 14 (3-4) : 341 - 350