共 50 条
- [21] HALT station at the Dortmund steel plant of Krupp Hoesch Stahl AG - design and operating results Stahl und Eisen, 1997, 117 (05): : 45 - 52
- [22] HALT facility at the Dortmund Steel Plant of Krupp Hoesch Stahl AG - Design and operating results. STAHL UND EISEN, 1997, 117 (05): : 45 - +
- [23] AUTOMATION IN THE BOCHUM STEEL WORKS OF KRUPP-STAHL-AG - PROCESS-CONTROL AND QUALITY ASSURANCE IN THE PRODUCTION OF STAINLESS-STEELS STAHL UND EISEN, 1992, 112 (06): : 97 - 102
- [24] PLANT OPERATIONAL EXPERIENCE WITH THE UHP FURNACE OF KRUPP-STAHL-AG IN THE WORKS BOCHUM STAHL UND EISEN, 1984, 104 (03): : 115 - 121
- [25] OPERATIONAL TECHNOLOGY OF MECHANIZED WORKS IN CROP PRODUCTION MORDOVIA UNIVERSITY BULLETIN, 2005, 3-4 : 165 - 166
- [26] Production of electrical sheet and IF steel grades at Thyssen Krupp Stahl AG Stahl Eisen, 8 (69-72):
- [27] Production of electrical sheet and IF steel grades at Thyssen Krupp Stahl AG STAHL UND EISEN, 1998, 118 (08): : 69 - +
- [28] INFLUENCE OF BOTTOM FLUSHING ON METALLURGICAL RESULTS IN LD-STEEL WORKS OF KRUPP-STAHL-AG STAHL UND EISEN, 1982, 102 (21): : I14 - I14
- [29] CONSTRUCTION OF A NEW PRIMARY AND SECONDARY DUST REMOVING PLANT IN THE STEEL WORKS BEECKERWERTH OF THYSSEN STAHL AG STAHL UND EISEN, 1987, 107 (20): : 937 - 938
- [30] AUTOMATION IN THE STEEL WORKS OF THYSSEN-STAHL-AG - IMPROVEMENT OF PRODUCT QUALITY, PLANT FLEXIBILITY AND PRODUCT RANGE STAHL UND EISEN, 1992, 112 (05): : 105 - 112