THE PORT OF PLOCE CONTAINER TERMINAL LOAD AND CAPACITY CALCULATIONS

被引:0
|
作者
Dundovic, Cedomir [1 ]
Hess, Svjetlana [1 ]
Santic, Livia [1 ]
机构
[1] Fac Maritime Rijeka, Studentska 2, Rijeka 51000, Croatia
关键词
transshipment and transport facilities; load of the transshipment and transport facilities; capacity of the container terminal;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Considering the regional plan of the new Ploce container terminal and the foreseen phases of construction, this paper aims at presenting a complete working technology, that is, the organization of the transport, transshipment and stowage of containers. For an efficient operation and considering the foreseen quantity of container traffic, a selection of the transshipment and transport facilities has been made. Based on the facilities dimensions, the authors of this paper have calculated the static and dynamic capacity of the container terminal for every phase of its construction. When designing the container terminal and its open stowage area, the authors have particularly taken into account the loads of the transshipment and transport facilities on the area. Therefore, the paper is focused on a detailed analysis of the construction characteristics, namely, on the loads of the transshipment and transport facilities, manufactured by a wide range of producers and presented today on the market, as well as to their final selection.
引用
收藏
页码:79 / 95
页数:17
相关论文
共 50 条
  • [1] MULTIPURPOSE CONTAINER TERMINAL IN PLOCE PORT
    Nadilo, Branko
    [J]. GRADEVINAR, 2009, 61 (10): : 955 - 967
  • [2] Planning of terminal construction at the Port of Ploce
    Dundovic, Cedomir
    Kovacic, Mirjana
    [J]. PROMET-TRAFFIC & TRANSPORTATION, 2007, 19 (04): : 247 - 257
  • [3] TESTING THE LOAD-BEARING CAPACITY OF HARBOUR NO. 5 IN THE PLOCE PORT
    Kovacevic, Meho Sasa
    Ivandic, Kreso
    Marcic, Danijela
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2011, 18 (03): : 417 - 422
  • [4] ENTRANCE TERMINAL OF THE PORT OF PLOCE - ENDPOINT OF THE VC CORRIDOR
    Vidak, Boris
    [J]. ROAD AND RAIL INFRASTRUCTURE IV, 2016, : 463 - 470
  • [5] Analysis of the competitiveness of Port of Ploce at the container transport market and the possibilities for improvement
    Rathman, Desa
    Kruzic, Borut
    Jugovic, Tanja Poletan
    [J]. POMORSTVO-SCIENTIFIC JOURNAL OF MARITIME RESEARCH, 2015, 29 (01) : 40 - 44
  • [6] BULK CARGO TERMINAL IN PLOCE PORT International cooperation on the project
    Nadilo, Branko
    [J]. GRADEVINAR, 2014, 66 (10): : 953 - 964
  • [7] Structural analysis of development capabilities of the Port of Ploce as a potential container port within MoS services
    Rathman, Desa
    Debelic, Borna
    Stumpf, Gorana
    [J]. POMORSTVO-SCIENTIFIC JOURNAL OF MARITIME RESEARCH, 2014, 28 (02) : 145 - 150
  • [8] QUEUING THEORY IN FUNCTION OF PLANNING THE CAPACITY OF THE CONTAINER TERMINAL IN PORT OF RIJEKA
    Zenzerovic, Zdenka
    Vilke, Sinisa
    Jurjevic, Mia
    [J]. POMORSTVO-SCIENTIFIC JOURNAL OF MARITIME RESEARCH, 2011, 25 (01) : 45 - 69
  • [9] ANALYSIS OF THE CRANE RAIL TRACKS OF BULK CARGO TERMINAL AT THE PORT OF PLOCE
    Lakusic, Stjepan
    Badovinac, Darko
    Grgic, Viktorija
    [J]. ROAD AND RAIL INFRASTRUCTURE IV, 2016, : 741 - 749
  • [10] Dynamic pile testing and finite element calculations for the bearing capacity of a quay wall foundation - Container terminal Altenwerder, Port of Hamburg
    Kirsch, F
    Plassmann, B
    Huch, T
    Rodatz, W
    [J]. APPLICATION OF STRESS-WAVE THEORY TO PILES: QUALITY ASSURANCE ON LAND AND OFFSHORE PILING, 2000, : 249 - 254