A PROCEDURE FOR THE ANALYSIS OF ERRORS OF COMMISSION IN A PROBABILISTIC SAFETY ASSESSMENT OF A NUCLEAR-POWER-PLANT AT FULL POWER

被引:36
|
作者
JULIUS, J
JORGENSON, E
PARRY, GW
MOSLEH, AM
机构
[1] NUS,GAITHERSBURG,MD 20878
[2] UNIV MARYLAND,COLLEGE PK,MD 20742
关键词
D O I
10.1016/0951-8320(95)00075-D
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper describes an analytical procedure that has been developed to facilitate the identification of errors of commission for inclusion in a Probabilistic Safety Assessment (PSA) of a nuclear power plant operating at full power. The procedure first identifies the opportunities for error by determining when operators are required to intervene to bring the plant to a safe condition following a transient, and then identifying under what conditions this is likely to occur using a model of the causes of error. In order to make the analysis practicable, a successive screening approach is used to identify those errors with the highest potential of occurrence, The procedure has been applied as part of a PSA study, and the results of that application are summarized, For the particular plant to which the procedure was applied, the conclusion was that, because of the nature of the procedures, the high degree of redundancy in the instrumentation, the operating practices, and the control board layouts, the potential for significant errors of commission is low.
引用
收藏
页码:189 / 201
页数:13
相关论文
共 50 条
  • [1] PROBABILISTIC SAFETY ANALYSIS FROM THE NUCLEAR-POWER-PLANT OPERATORS POINT OF VIEW
    JAERSCHKY, R
    RINGEIS, W
    [J]. ATOMWIRTSCHAFT-ATOMTECHNIK, 1990, 35 (07): : 330 - 334
  • [2] Procedure for the analysis of errors of commission during non-power modes of nuclear power plant operation
    Julius, JA
    Jorgenson, EJ
    Parry, GW
    Mosleh, AM
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 1996, 53 (02) : 139 - 154
  • [3] THE WEST AND EASTERN NUCLEAR-POWER-PLANT SAFETY
    LIST, M
    [J]. AUSSEN POLITIK, 1993, 44 (04): : 344 - 353
  • [4] ORGANIZATIONAL PROCESSES AND NUCLEAR-POWER-PLANT SAFETY
    JACOBS, R
    HABER, S
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 1994, 45 (1-2) : 75 - 83
  • [5] SUGGESTIONS FOR THE ENHANCEMENT OF NUCLEAR-POWER-PLANT SAFETY
    CLARKE, MC
    KEMENY, LG
    [J]. NUCLEAR SAFETY, 1987, 28 (01): : 71 - 76
  • [6] NUCLEAR-POWER-PLANT MALFUNCTION ANALYSIS
    KAPLAN, G
    [J]. IEEE SPECTRUM, 1983, 20 (06) : 53 - 58
  • [7] SAFETY ASSESSMENT OF THE GREIFSWALD NUCLEAR-POWER-PLANT, UNITS 1 TO 4
    HEUSER, FW
    JANKE, R
    [J]. KERNTECHNIK, 1991, 56 (01) : 16 - 21
  • [8] Probabilistic safety analysis for the Brokdorf Nuclear Power Plant
    Hanisch, T
    Wenzel, J
    [J]. ANNUAL MEETING ON NUCLEAR TECHNOLOGY '97, 1997, : 283 - 286
  • [9] APPLICATION OF PROBABILISTIC SAFETY ANALYSIS FOR NUCLEAR POWER PLANT OVERHAUL RISK ASSESSMENT
    Liu, Deyi
    Cao, Yong
    Zhao, Ming
    Luo, Yang
    Zou, Shengjia
    Hu, Mengying
    Xu, Jie
    Wang, Li
    Zhao, Ling
    [J]. PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 3, 2021,
  • [10] PROBABILITY ANALYSIS OF NUCLEAR-POWER-PLANT SAFETY - SIGNIFICANCE IN DESIGN PRACTICE
    MITENKOV, FM
    AVERBAKH, BA
    [J]. ATOMIC ENERGY, 1992, 72 (04) : 303 - 308