A BROADER VIEW OF THE JOB-SHOP SCHEDULING PROBLEM

被引:93
|
作者
WEIN, LM [1 ]
CHEVALIER, PB [1 ]
机构
[1] MIT,OPERAT RES CTR,CAMBRIDGE,MA 02139
关键词
PRODUCTION SCHEDULING; QUEUING NETWORKS;
D O I
10.1287/mnsc.38.7.1018
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We define a job-shop scheduling problem with three dynamic decisions: assigning due-dates to exogenously arriving jobs, releasing jobs from a backlog to the shop floor, and sequencing jobs at each of two workstations in the shop. The job-shop is modeled as a multiclass queueing network and the objective is to minimize both the work-in-process (WIP) inventory on the shop floor and the due-date lead time (due-date minus arrival date) of jobs, subject to an upper bound constraint on the proportion of tardy jobs. A general two-step approach to this problem is proposed: (1) release and sequence jobs in order to minimize the WIP inventory subject to completing jobs at a specified rate, and (2) given the policies in (1), set due-dates that will attempt to minimize the due-date lead time, subject to the job tardiness constraint. A simulation study shows that this approach easily outperforms other combinations of traditional due-date setting, job release, and priority sequencing policies for two cases (moderately loaded and heavily loaded) of a particular shop. As a result of the study, three scheduling principles are proposed that can significantly improve the performance of a two-station job-shop; in particular, better due-date performance can be achieved by ignoring due-dates on the shop floor. Although we have only considered a two-station shop, the approach and scheduling principles presented here might also be useful for larger shops.
引用
下载
收藏
页码:1018 / 1033
页数:16
相关论文
共 50 条
  • [41] A Hybrid Genetic Algorithm for Job-Shop Scheduling Problem
    Wang Lihong
    Ten Haikun
    Yu Guanghua
    2015 IEEE 28TH CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (CCECE), 2015, : 271 - 274
  • [42] New scheduling type applied to solving job-shop scheduling problem
    Zhang, Chaoyong
    Guan, Zailin
    Liu, Qiong
    Shao, Xinyu
    Li, Peigen
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2008, 44 (10): : 24 - 31
  • [43] Solving nonstandard job-shop scheduling problem by efficient scheduling algorithm
    Wang, Feng-Ru
    Xu, Wei-Wen
    Xu, Hong-Fu
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2001, 7 (07): : 12 - 15
  • [44] SCHEDULING THE GENERAL JOB-SHOP
    BARKER, JR
    MCMAHON, GB
    MANAGEMENT SCIENCE, 1985, 31 (05) : 594 - 598
  • [45] Multiple colony ant algorithm for job-shop scheduling problem
    Udomsakdigool, A.
    Kachitvichyanukul, V.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (15) : 4155 - 4175
  • [46] Solving Job-shop Scheduling Problem by an Improved Genetic Algorithm
    Yang Yanli
    Ke Weiwei
    PRECISION ENGINEERING AND NON-TRADITIONAL MACHINING, 2012, 411 : 588 - 591
  • [47] Bilevel genetic algorithm for the flexible job-shop scheduling problem
    Zhang, Chaoyong
    Rao, Yunqing
    Li, Peigen
    Shao, Xinyu
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2007, 43 (04): : 119 - 124
  • [48] A heuristic algorithm for the distributed and flexible job-shop scheduling problem
    Mohsen Ziaee
    The Journal of Supercomputing, 2014, 67 : 69 - 83
  • [49] Active solution space and search on job-shop scheduling problem
    Watanabe, Masato
    Ida, Kenichi
    Gen, Mitsuo
    Electrical Engineering in Japan (English translation of Denki Gakkai Ronbunshi), 2006, 154 (04): : 61 - 67
  • [50] An application of genetic algorithms for the flexible job-shop scheduling problem
    Wang, J. (wjf266@hotmail.com), 1600, Advanced Institute of Convergence Information Technology (04):