AN APPLICATION OF DISCRETE MATHEMATICS IN THE DESIGN OF AN OPEN-PIT MINE

被引:20
|
作者
CACCETTA, L
GIANNINI, LM
机构
关键词
D O I
10.1016/0166-218X(88)90030-3
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
引用
下载
收藏
页码:1 / 19
页数:19
相关论文
共 50 条
  • [31] MODELING AN OPEN-PIT MINE IN A MULTITEST STATEMENT
    NAZAROV, IV
    KORTELEV, OB
    JOURNAL OF MINING SCIENCE, 1993, 29 (05) : 434 - 439
  • [32] A STUDY OF RADIATION PARAMETERS IN AN OPEN-PIT MINE
    LEACH, VA
    LOKAN, KH
    MARTIN, LJ
    HEALTH PHYSICS, 1982, 43 (03): : 363 - 375
  • [33] Scheduling of open-pit phosphate mine extraction
    Azzamouri, Ahlam
    Fenies, Pierre
    Fontane, Frederic
    Giard, Vincent
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (23) : 7122 - 7141
  • [34] CUTOFFS GRADE CALCULATIONS FOR AN OPEN-PIT MINE
    JOHN, HT
    CIM BULLETIN, 1985, 78 (879): : 73 - 75
  • [35] Optimized Transportation of the Open-pit Coal Mine
    Cai B.
    Hao J.
    Zhu H.
    Chen H.
    Journal of Engineering Science and Technology Review, 2022, 15 (04) : 90 - 95
  • [36] Buckling failure at an open-pit coal mine
    Aydan, O
    Ulusay, R
    Kumsar, H
    Ersen, A
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 641 - 648
  • [37] OPEN-PIT MINE AT ASBESTOS-HILL
    ROUSSIN, R
    CIM BULLETIN, 1976, 69 (775): : 70 - 74
  • [38] CUTOFFS GRADE CALCULATION FOR THE OPEN-PIT MINE
    JOHN, T
    CIM BULLETIN, 1984, 77 (863): : 91 - 91
  • [39] Update on open-pit coal mine blasting
    Adhikari, G.R.
    Gupta, R.N.
    Singh, R.B.
    Journal of Mines, Metals and Fuels, 1987, 35 (06): : 219 - 222
  • [40] Open-Pit Mine Optimization with Maximum Satisfiability
    Deutsch, Matthew
    MINING METALLURGY & EXPLORATION, 2019, 36 (04) : 757 - 764