The results of the simulation process management

被引:0
|
作者
Mazurin, E. B. [1 ]
Lapushkin, I. I. [2 ]
Lazarev, A. L. [3 ]
机构
[1] Bauman Moscow State Tech Univ, Dept Econ & Org Prod, Tech Sci, Moscow, Russia
[2] Bauman Moscow State Tech Univ, Dept Econ & Org Prod, Moscow, Russia
[3] Integrator IT Co, Moscow, Russia
关键词
management; process control model; project management; regulation of processes; adaptive management;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The aim of the article. The goal of the article is to discuss the model of the management of main production processes (in particular case of projects in the company). The results of the analysis. As a subject of the study it is offered to use a substantial part of the process of decision-making. Scientific novelty of research is in consideration of decision-making process from the point of view of information flow interaction of regulated process with the information flow from implementation of the planned process algorithm. The results of the simulation can be used to calculate the expected completion dates of projects, costs and project risks. For research of the process of management of key business processes at the "Integrator IT" Company, which main activity is performing design works on software development, together with the Department of Economics and Organization of Production" of Bauman Moscow State Technical University it was developed a model of control circuit. The model allows studying the process of management withing different organizational structures, principles and levels of regulation. It is proposed to use the following interpretation of the links of a regulation: 1) amplifier (proportional link) elaboration of management decisions and the impact on subordinates in proportion to the deviation of planned and actual indicators of activity of the company; 2) aperiodic unit - development of a control action when the perturbation is growing rapidly, but as it approaches the value of the disturbing magnitude slows down its growth; 3) oscillatory link managers carry out the control action with a variable "force"; 4) integrating link is possible only with a special information system for management, when the current values of the indicators activity of the company are calculated not only on the absolute value, but cumulatively; 5) differentiating link - as well as for the link you really needs a special information system for management. Conclusions and directions of further researches. Model of the control circuit is implemented in the matrix system MATLAB R2006/2007c using visual block simulation Simulink 7. The article provides a substantial description of the model of the project management process in the company. It describes the process of model data interpreting. Proposed duration of the project works to translate in relative units (used interest, i.e. the deadline for completion of design work has been taken as 100%). The model can calculate the total project time, folded planned total accumulated complexity of the project and the total accumulated value of external disturbance (taking into account the mark showing a positive or negative impact), and dividing by the number of performers in the project.
引用
收藏
页码:161 / 171
页数:11
相关论文
共 50 条
  • [31] BUSINESS PROCESS MANAGEMENT: USE OF SIMULATION IN THE PUBLIC SECTOR
    Pecek, Bojan
    Kovacic, Andrej
    ECONOMIC RESEARCH-EKONOMSKA ISTRAZIVANJA, 2011, 24 (01): : 95 - 106
  • [32] Optimization and Management of Flotation Deinking Banks by Process Simulation
    Beneventi, Davide
    Zeno, Elisa
    Nortier, Patrice
    Carre, Bruno
    Dorris, Gilles
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (08) : 3964 - 3972
  • [33] Towards simulation-based business process management
    Weyland, JH
    Engiles, M
    PROCEEDINGS OF THE 2003 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2003, : 225 - 227
  • [34] Quality management in the hospital - Process and results continuously improving
    Vagts, Dierk
    Martin, Joerg
    Dahmen, Klaus
    ANASTHESIOLOGIE INTENSIVMEDIZIN NOTFALLMEDIZIN SCHMERZTHERAPIE, 2008, 43 (02): : 156 - 160
  • [35] SIMULATION AND THEORETICAL RESULTS ON CLUSTER MANAGEMENT AND DIRECTORY MANAGEMENT IN DYNAMIC HIERARCHICAL NETWORKS
    SHEN, SM
    ABUAMARA, H
    TSAI, WK
    TSAI, WT
    IEEE TRANSACTIONS ON COMMUNICATIONS, 1992, 40 (02) : 312 - 324
  • [36] Injection moulding simulation results as an input to the injection moulding process
    Nardin, B
    Kuzman, K
    Kampus, Z
    JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2002, 130 : 310 - 314
  • [37] Tools for computer aided analysis and interpretation of process simulation results
    Gaubert, MA
    Joulia, X
    COMPUTERS & CHEMICAL ENGINEERING, 1997, 21 : S205 - S210
  • [38] Hierarchical Simulation of Process Variations and Their Impact on Circuits and Systems: Results
    Lorenz, Juergen K.
    Baer, Eberhard
    Clees, Tanja
    Evanschitzky, Peter
    Jancke, Roland
    Kampen, Christian
    Paschen, Uwe
    Salzig, Christian P. J.
    Selberherr, Siegfried
    IEEE TRANSACTIONS ON ELECTRON DEVICES, 2011, 58 (08) : 2227 - 2234
  • [39] Tools for computer aided analysis and interpretation of process simulation results
    Inst. Natl. Polytech. de Toulouse, Ecl. Natl. Sup. d'Ing. Genie Chim., Inst. du Genie des Procedes, 18, chemin de la Loge, 31078 Toulouse Cedex, France
    Comput. Chem. Eng., SUPPL.1 (S205-S210):
  • [40] RESEARCH OF THE PILE FOUNDATION PROCESS DYNAMICS. SIMULATION RESULTS
    Abadjiev, Valentin
    Abadjieva, Emilia
    COMPTES RENDUS DE L ACADEMIE BULGARE DES SCIENCES, 2010, 63 (12): : 1795 - 1806