The results of the simulation process management

被引:0
|
作者
Mazurin, E. B. [1 ]
Lapushkin, I. I. [2 ]
Lazarev, A. L. [3 ]
机构
[1] Bauman Moscow State Tech Univ, Dept Econ & Org Prod, Tech Sci, Moscow, Russia
[2] Bauman Moscow State Tech Univ, Dept Econ & Org Prod, Moscow, Russia
[3] Integrator IT Co, Moscow, Russia
关键词
management; process control model; project management; regulation of processes; adaptive management;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The aim of the article. The goal of the article is to discuss the model of the management of main production processes (in particular case of projects in the company). The results of the analysis. As a subject of the study it is offered to use a substantial part of the process of decision-making. Scientific novelty of research is in consideration of decision-making process from the point of view of information flow interaction of regulated process with the information flow from implementation of the planned process algorithm. The results of the simulation can be used to calculate the expected completion dates of projects, costs and project risks. For research of the process of management of key business processes at the "Integrator IT" Company, which main activity is performing design works on software development, together with the Department of Economics and Organization of Production" of Bauman Moscow State Technical University it was developed a model of control circuit. The model allows studying the process of management withing different organizational structures, principles and levels of regulation. It is proposed to use the following interpretation of the links of a regulation: 1) amplifier (proportional link) elaboration of management decisions and the impact on subordinates in proportion to the deviation of planned and actual indicators of activity of the company; 2) aperiodic unit - development of a control action when the perturbation is growing rapidly, but as it approaches the value of the disturbing magnitude slows down its growth; 3) oscillatory link managers carry out the control action with a variable "force"; 4) integrating link is possible only with a special information system for management, when the current values of the indicators activity of the company are calculated not only on the absolute value, but cumulatively; 5) differentiating link - as well as for the link you really needs a special information system for management. Conclusions and directions of further researches. Model of the control circuit is implemented in the matrix system MATLAB R2006/2007c using visual block simulation Simulink 7. The article provides a substantial description of the model of the project management process in the company. It describes the process of model data interpreting. Proposed duration of the project works to translate in relative units (used interest, i.e. the deadline for completion of design work has been taken as 100%). The model can calculate the total project time, folded planned total accumulated complexity of the project and the total accumulated value of external disturbance (taking into account the mark showing a positive or negative impact), and dividing by the number of performers in the project.
引用
收藏
页码:161 / 171
页数:11
相关论文
共 50 条
  • [1] Verification of results of swaging process simulation
    Piela, A
    [J]. ARCHIVES OF METALLURGY, 1999, 44 (04): : 453 - 464
  • [2] SIMULATION STANDARD FOR BUSINESS PROCESS MANAGEMENT
    Januszczak, John
    Hook, Geoff
    [J]. PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 741 - 751
  • [3] FEM simulation of quenching process and experimental verification of simulation results
    Li Huiping
    Zhao Guoqun
    Niu Shanting
    Huang Chuanzhen
    [J]. MATERIALS SCIENCE AND ENGINEERING A-STRUCTURAL MATERIALS PROPERTIES MICROSTRUCTURE AND PROCESSING, 2007, 452 : 705 - 714
  • [4] Software process simulation for reliability management
    Rus, I
    Collofello, J
    Lakey, P
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 1999, 46 (2-3) : 173 - 182
  • [5] Results of the NAMUR survey: process management - position of technique and expectations of the user Results of the NAMUR Process Management survey
    Schmitz, Stefan
    Duennebier, Guido
    de Leeuw, Valentijn
    [J]. AUTOMATION 2009, 2009, 2067 : 401 - 404
  • [6] Dynamic simulation of process control of the reactive sputter process and experimental results
    Malkomes, N
    Vergöhl, M
    [J]. JOURNAL OF APPLIED PHYSICS, 2001, 89 (01) : 732 - 739
  • [7] Process analysis, modeling and simulation for crisis management
    Rousseaux, Francis
    Lhoste, Kevin
    [J]. IWAISE 2008: INTERNATIONAL WORKSHOP ON ADVANCED INFORMATION SYSTEMS FOR ENTERPRISES, PROCEEDINGS, 2008, : 41 - +
  • [8] Web based process management and simulation tool
    Kaylan, AR
    Ziya, S
    Kemahlioglu, E
    [J]. ESS'98 - SIMULATION TECHNOLOGY: SCIENCE AND ART, 1998, : 433 - 438
  • [9] A Stochastic Simulation Model for Risk Management Process
    Zhou, Peng
    Leung, Hareton K. N.
    [J]. 2012 19TH ASIA-PACIFIC SOFTWARE ENGINEERING CONFERENCE (APSEC), VOL 1, 2012, : 737 - 742
  • [10] Understanding management of computational process modeling and simulation
    Michael Wadsley
    [J]. JOM, 2004, 56 : 33 - 36