Estimating of capital cost of underground car parking projects

被引:1
|
作者
Bastos, Monica [1 ]
Ribeiro, Francisco [2 ]
Teixeira, Jose [3 ]
机构
[1] Rua Joly Braga Santos,Lote M,6 Dto, P-1600123 Lisbon, Portugal
[2] Inst Super Tecn, Dept Engn Civil & Arquitectura, Seccao Estruturas & Construcao, P-1049 Lisbon, Portugal
[3] Univ Minho, Escola Engn, P-4800058 Guimaraes, Portugal
关键词
capital cost; modelling; underground carparks; multiple regression;
D O I
10.1108/13664380580001070
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Underground parking projects are expensive. The capital cost of underground parking projects has been, and still is, one of the promoter's main economic concerns. Therefore, the capital cost estimation is an essential task in the early stages of underground parking projects. In this context, the promoters mainly use cost estimation models, most of them produced by methodologies with lack of precision and with low performances. Over the last years Portugal has embarked on a large programme of underground parking projects in the major cities. The present research work is based on data and knowledge colleted from that programme. This paper presents an analysis of the underground parking projects built and underway in Portugal. It discusses the main variables influencing the capital cost of underground parking projects. Finally, it presents a mathematical model for estimating capital cost of this type of project during the planning phase.
引用
收藏
页码:126 / 132
页数:7
相关论文
共 50 条
  • [31] Performance of Risk-Based Estimating for Capital Projects
    Gabel, Mark
    Sujka, Mark
    Davis, Zachary W.
    Keizur, Alan E.
    TRANSPORTATION RESEARCH RECORD, 2022,
  • [32] Institutional Economics and the Cost of Capital for Infrastructure Projects
    Geddes, R. Richard
    Goldman, Joshua
    JOURNAL OF ECONOMIC POLICY REFORM, 2022, 25 (02) : 85 - 102
  • [33] CASH FLOW IN FIXED CAPITAL COST PROJECTS
    BAUMAN, HC
    INDUSTRIAL AND ENGINEERING CHEMISTRY, 1961, 53 (08): : A49 - A50
  • [34] Document support of cost management in underground construction projects
    Bovsunovskaya, Maria
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 960 - 964
  • [35] PRELIMINARY DESIGN AND COST ESTIMATING FOR RESERVOIR PROJECTS
    WALSKI, TM
    PELLICCIA, A
    WATER RESOURCES BULLETIN, 1981, 17 (01): : 49 - 56
  • [36] Estimating time and cost for policies and procedures projects
    Escoe, A
    STC'S 50TH ANNUAL CONFERENCE, PROCEEDINGS, 2003, : 24 - 25
  • [37] Cost estimating challenges face frontier projects
    McIntire, PB
    OIL & GAS JOURNAL, 2001, 99 (33) : 30 - 34
  • [38] Preliminary Cost Estimating for Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 158 - 161
  • [39] Description-experience gap under imperfect information Information continuum and aggressive cost estimating in capital projects
    Du, Jing
    Wang, Qi
    Shi, Qian
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (06) : 1151 - 1170
  • [40] Underground Parking system
    不详
    BAUINGENIEUR, 2011, 86 : A22 - A23