WAVE POWER COST ESTIMATES CUT

被引:0
|
作者
不详
机构
关键词
D O I
暂无
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
引用
收藏
页码:112 / 113
页数:2
相关论文
共 50 条
  • [21] Shared mooring system designs and cost estimates for wave energy arrays
    Housner, Stein
    Hall, Matthew
    Tran, Thanh Toan
    Para, Borja de Miguel
    Maeso, Aimar
    RENEWABLE ENERGY, 2024, 231
  • [22] Low-cost touch pads cut power drain by 85%
    Strassberg, D
    EDN, 1996, 41 (22) : 16 - 16
  • [23] COAL-FIRED POWER PLANT CAPITAL COST ESTIMATES.
    Dunlop, W.
    Holstein, R.A.
    Electric Power Research Institute (Report) EPRI PE, 1981,
  • [24] APPLICATION OF PROBABILISTIC METHODS TO ENGINEERING ESTIMATES OF SPEED, POWER, WEIGHT, AND COST
    HUTCHISON, BL
    MARINE TECHNOLOGY AND SNAME NEWS, 1985, 22 (04): : 358 - 372
  • [25] Improving cost estimates for advanced low-carbon power plants
    Rubin, Edward S.
    INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2019, 88 : 1 - 9
  • [26] Cut detection cost
    Grohman, F
    AVIATION WEEK & SPACE TECHNOLOGY, 1998, 149 (12): : 6 - 6
  • [27] CAN COST BE CUT
    SINNOT, WB
    DANNUNZI.JD
    ROBERTS, CV
    RING, CA
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1970, 62 (11): : 694 - &
  • [28] Field based estimates of wave power at a nearshore Mediterranean locale for sustainable wave energy harnessing
    Foteinis, Spyros
    Synolakis, Costas Emmanuel
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2023, 59
  • [29] Power Cut
    Holden, Jenny
    JUNCTURES-THE JOURNAL FOR THEMATIC DIALOGUE, 2009, (12): : 113 - 118
  • [30] Analytical estimates of short duration mean power output and variability for deepwater wave power generation
    Roy, Sanjoy
    ENERGY, 2021, 230