共 50 条
- [41] Silicon products - Dow ready to decide on site [J]. EUROPEAN CHEMICAL NEWS, 1998, 69 (1795): : 45 - 45
- [46] EASTMAN TO BUILD 3-PHASE OXO CHEMICAL SITE [J]. EUROPEAN CHEMICAL NEWS, 1995, 64 (1679): : 57 - 57
- [48] Framework to decide for a volume flexible chemical plant during early phases of plant design [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2017, 128 : 85 - 94