Underground void filling by cemented mill tailings

被引:34
|
作者
Singh, Choudhary Bhanwar [1 ]
Santosh, Kumar [1 ]
机构
[1] Indian Sch Mines, Dept Min, Dhanbad 826004, Bihar, India
关键词
Underground; Cemented mill tailings; Backfilling; Metal mining; Super plasticizer;
D O I
10.1016/j.ijmst.2013.11.003
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Underground mining always create voids. These voids can cause subsidence of surface. So it is always a demand to fill the void in such a manner that the effect of underground mining can be minimized. Void filling using mill tailings especially in metal mining is one of the best techniques. The tailings produced in milling process have traditionally been disposed in tailing ponds creating a waste disposal and environmental problems in terms of land degradation, air and water pollution, etc. This disposal practice is more acute in the metal milling industry where the fine grinding, required for value liberation, results in the production of very fine tailings in large percentage. This paper includes discussions on the effectiveness of different paste mixes with varying cement contents in paste backfilling operations. The results revealed that material composition and use of super plasticizer strongly influenced the strength of cemented backfill. (C) 2013 Published by Elsevier B.V. on behalf of China University of Mining & Technology.
引用
收藏
页码:893 / 900
页数:8
相关论文
共 50 条
  • [41] A new procedure for recycling waste tailings as cemented paste backfill to underground stopes and open pits
    Lu, Hongjian
    Qi, Chongchong
    Chen, Qiusong
    Gan, Deqing
    Xue, Zhenlin
    Hu, Yajun
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 188 : 601 - 612
  • [42] Tensile strength of cemented paste backfill for lead–zinc mill tailings: lab and in situ scenarios
    Santosh Kumar Behera
    Devi Prasad Mishra
    Prashant Singh
    Ashok Godugu
    Kanhaiya Mishra
    Phanil Kumar Mandal
    Sujit Kumar Mandal
    Arvind Kumar Mishra
    [J]. Arabian Journal of Geosciences, 2023, 16 (8)
  • [43] BEHAVIOR OF CEMENTED TAILINGS SANDS
    MITCHELL, RJ
    WONG, BC
    [J]. CANADIAN GEOTECHNICAL JOURNAL, 1982, 19 (03) : 289 - 245
  • [44] Filling the training void
    Eyking, Adrianna
    [J]. Marine Technology, 2014, 51 (04) : 72 - 75
  • [45] FILLING THE VOID IN BOOTES
    BALZANO, VA
    WEEDMAN, DW
    [J]. ASTROPHYSICAL JOURNAL, 1982, 255 (01): : L1 - L4
  • [46] Experiment of shear thixotropy of cemented tailings filling slurry and its prediction model based on dimensional analysis
    Zhang Y.-Z.
    Gan D.-Q.
    Chen X.
    Xue Z.-L.
    Ren W.-C.
    [J]. Zhongguo Youse Jinshu Xuebao/Chinese Journal of Nonferrous Metals, 2020, 30 (04): : 951 - 959
  • [47] Filling the Leadership Void
    Steyer, Terrence E.
    [J]. FAMILY MEDICINE, 2010, 42 (03) : 162 - 163
  • [48] Utilization of industrial waste products as pozzolanic material in cemented paste backfill of high sulphide mill tailings
    Ercikdi, Bayram
    Cihangir, Ferdi
    Kesimal, Ayhan
    Deveci, Haci
    Alp, Ibrahim
    [J]. JOURNAL OF HAZARDOUS MATERIALS, 2009, 168 (2-3) : 848 - 856
  • [49] Utilization of water-reducing admixtures in cemented paste backfill of sulphide-rich mill tailings
    Ercikdi, Bayram
    Cihangir, Ferdi
    Kesimal, Ayhan
    Deveci, Haci
    Alp, Ibrahim
    [J]. JOURNAL OF HAZARDOUS MATERIALS, 2010, 179 (1-3) : 940 - 946
  • [50] Reclamation of mill tailings
    Chaphekar, S
    [J]. CURRENT SCIENCE, 2001, 81 (10): : 1278 - 1278