FLEXIBLE MANUFACTURING SYSTEM (FMS) SCHEDULING USING FILTERED BEAM SEARCH

被引:16
|
作者
DE, SJ [1 ]
LEE, A [1 ]
机构
[1] UNIV IOWA,DEPT MANAGEMENT SCI,IOWA CITY,IA 52242
关键词
FLEXIBLE MANUFACTURING SYSTEM; KNOWLEDGE-BASED SYSTEM; SCHEDULING; FILTERED BEAM SEARCH;
D O I
10.1007/BF01572636
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper reports our effort to develop a knowledge based system for scheduling jobs in a flexible manufacturing system (FMS). We view FMS scheduling as a two-stage process: static scheduling, followed by real-time rescheduling if unanticipated events were to occur. This paper deals with the static scheduling stage. The system uses a frame-based knowledge representation scheme and a problem-solving strategy based on filtered beam search. Filtered beam search views a scheduling problem as a state space search and generates a 'good' schedule quickly by controlling the amount of search required. Evaluation functions are used to decide which branches are the most promising. An important feature of this system, in our view, is the explicit manner in which environmental, procedural and structural knowledge (stored in the knowledge base using a frame-based scheme) can be used to improve the quality of the generated schedule. The system has been implemented and tested using Common Lisp on a Macintosh system with a 3MB main memory and a 40MB hard disk. Computational experience with our system is reported.
引用
收藏
页码:165 / 183
页数:19
相关论文
共 50 条
  • [31] Using data continualization and expansion to improve small data set learning accuracy for early flexible manufacturing system (FMS) scheduling
    Li, D. -C.
    Wu, C.
    Chang, F. M.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (21) : 4491 - 4509
  • [32] Scheduling flexible manufacturing system based on timed petri net and heuristic search
    Li, Cheng
    Li, Shuang
    Feng, Yi-Ping
    Rong, Gang
    [J]. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2015, 49 (05): : 708 - 713
  • [33] Scheduling of a class of partial routing FMS in uncertain environments with beam search
    Cherif, G.
    Leclercq, E.
    Lefebvre, D.
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2023, 34 (02) : 493 - 514
  • [34] Scheduling of a class of partial routing FMS in uncertain environments with beam search
    G. Cherif
    E. Leclercq
    D. Lefebvre
    [J]. Journal of Intelligent Manufacturing, 2023, 34 : 493 - 514
  • [35] SCHEDULING OPTIMIZATION OF FLEXIBLE MANUFACTURING SYSTEM USING GENETIC ALGORITHMS
    Cristea, Ciprian
    [J]. ACTA TECHNICA NAPOCENSIS SERIES-APPLIED MATHEMATICS MECHANICS AND ENGINEERING, 2013, 56 (01): : 95 - 98
  • [36] Integrated scheduling of flexible manufacturing system using evolutionary algorithms
    Udhayakumar, P.
    Kumanan, S.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (5-8): : 621 - 635
  • [37] Optimization Scheduling for Flexible Manufacturing System using Petri net
    Tung Pham Truong
    Phuoc Pham Dang
    Binh Luu Duc
    [J]. PROCEEDINGS OF 2018 4TH INTERNATIONAL CONFERENCE ON GREEN TECHNOLOGY AND SUSTAINABLE DEVELOPMENT (GTSD), 2018, : 763 - 770
  • [38] Dynamic scheduling of flexible manufacturing system using heuristic approach
    Kumar M.V.
    Murthy A.N.N.
    Chandrasekhara K.
    [J]. OPSEARCH, 2011, 48 (1) : 1 - 19
  • [39] Integrated scheduling of flexible manufacturing system using evolutionary algorithms
    P. Udhayakumar
    S. Kumanan
    [J]. The International Journal of Advanced Manufacturing Technology, 2012, 61 : 621 - 635
  • [40] Heuristic Search for Scheduling Flexible Manufacturing Systems Using Multiple Heuristic Functions
    Huang, Bo
    Jiang, Rongxi
    Zhang, Gongxuan
    [J]. MODERN ADVANCES IN APPLIED INTELLIGENCE, IEA/AIE 2014, PT I, 2014, 8481 : 178 - 187