共 50 条
- [21] PRECAST CONCRETE SEGMENTS SPEED FREEWAY BRIDGE CONSTRUCTION AUSTRALIAN CIVIL ENGINEERING, 1968, 9 (08): : 36 - &
- [22] USE OF PLASTICS IN JOINTS BETWEEN PRECAST CONCRETE ELEMENTS. Betonwerk und Fertigteil-Technik/Concrete Precasting Plant and Technology, 1987, 53 (12): : 833 - 837
- [25] Ultra-high-performance concrete connections for precast concrete bridge decks PCI JOURNAL, 2014, : 48 - 62
- [27] Fatigue strength of welded joints in orthotropic steel bridge decks Welding in the World, Le Soudage Dans Le Monde, 1996, 38 : 175 - 194
- [28] Fatigue strength of welded joints in orthotropic steel bridge decks PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON WELDED STRUCTURES IN PARTICULAR WELDED BRIDGES, 1996, : 179 - 198
- [30] Experimental evaluation of overlays for precast concrete decks used in accelerated bridge construction PCI JOURNAL, 2015, : 65 - 75