INTEGRATED SYSTEM TO DEVELOP HIGHWAY REHABILITATION PROJECTS

被引:2
|
作者
KHAN, SI
RITCHIE, SG
KAMPE, K
机构
[1] Inst of Transp. Studies, Univ. of California, Irvine, CA, 92717-3600, 401 Berkeley Ave.
[2] Inst. of Transp. Studies, Univ. of California, Irvine, CA
[3] Office of Proj. Ping. and Design, Caltrans, Sacramento, CA, 95825
来源
关键词
D O I
10.1061/(ASCE)0733-947X(1994)120:1(1)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Highway resurfacing, restoration, rehabilitation, and reconstruction can extend the life of an existing facility. At the same time, enhanced safety can be engineered into a project by making improvements to other features that relate to, for example, bridge improvements, minor widening of lanes and shoulders, and minor alterations to horizontal and vertical alignment, in addition to pavement resurfacing and repair. Recent rehabilitation projects in California that were expanded to include safety enhancements resulted in original project-cost estimates underestimating costs, often by millions of dollars. This paper presents an integrated database-management expert-system computer program (4RSCOPE), which is a design tool to address this problem. The program has been developed to allow Caltrans engineers to gather data from both office records and field assessments, determine the design features to be included, and thus determine the project scope. The program is expected to become the standard system used by district engineers statewide in California to develop rehabilitation projects.
引用
收藏
页码:1 / 20
页数:20
相关论文
共 50 条
  • [41] Work Projects Develop Interest
    Fletcher, Alma
    [J]. OCCUPATIONS-THE VOCATIONAL GUIDANCE MAGAZINE, 1940, 18 (08): : 609 - 610
  • [42] DISCUSSION OF ENGINEER PARTICIPATION IN HIGHWAY DESIGN INTEGRATED PROGRAM SYSTEM
    DEAVIN, P
    URWIN, R
    LEE, GH
    NICHOLAS, R
    AYTON, MC
    [J]. JOURNAL OF THE INSTITUTION OF HIGHWAY ENGINEERS, 1969, 16 (08): : 11 - &
  • [43] Innovative highway rehabilitation construction
    Roberts, FL
    Djakfar, L
    [J]. MATERIALS AND CONSTRUCTION: EXPLORING THE CONNECTION, 1999, : 892 - 899
  • [44] Early warning system for highway construction projects using GA-SVM
    Shafaat, Ali
    Marbouti, Farshid
    Mahfouz, Tarek
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (14) : 2348 - 2357
  • [45] System Dynamics (SD) -based concession pricing model for PPP highway projects
    Xu, Yelin
    Sun, Chengshuang
    Skibniewski, Miroslaw J.
    Chan, Albert P. C.
    Yeung, John F. Y.
    Cheng, Hu
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (02) : 240 - 251
  • [46] Problems in setting up the environmental post assessment system for highway construction projects
    Dong, X.L.
    Zhao, J.Q.
    Song, C.
    [J]. Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2001, 14 (03):
  • [47] Development of decision-making system measuring the resilience level of highway projects
    Nipa T.J.
    Kermanshachi S.
    Pamidimukkala A.
    [J]. Journal of Infrastructure Preservation and Resilience, 2023, 4 (01):
  • [48] Integrated Pedal System for Data Driven Rehabilitation
    Schaer, Alessandro
    Helander, Oskar
    Buffa, Francesco
    Mueller, Alexis
    Schneider, Kevin
    Maurenbrecher, Henrik
    Becsek, Barna
    Chatzipirpiridis, George
    Ergeneman, Olgac
    Pane, Salvador
    Nelson, Bradley J.
    Schaffert, Nina
    [J]. SENSORS, 2021, 21 (23)
  • [49] Development of a Sustainability Evaluation System for Culvert Replacement and Rehabilitation Projects
    Tetreault, Jacob
    Moore, Ian D.
    Hoult, Neil A.
    Tanzil, Dicksen
    Maher, Michael L. J.
    [J]. JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2018, 9 (02)
  • [50] The Integrated Virtual Environment Rehabilitation Treadmill System
    Feasel, Jeff
    Whitton, Mary C.
    Kassler, Laura
    Brooks, Frederick P., Jr.
    Lewek, Michael D.
    [J]. IEEE TRANSACTIONS ON NEURAL SYSTEMS AND REHABILITATION ENGINEERING, 2011, 19 (03) : 290 - 297