ROLL GRINDER SELECTION, INSTALLATION AND COMMISSIONING

被引:0
|
作者
HOWARD, RA [1 ]
SCOLES, DJ [1 ]
机构
[1] AUSTRALIAN NEWSPRINT MILLS,BOYER,AUSTRALIA
来源
APPITA | 1977年 / 31卷 / 01期
关键词
D O I
暂无
中图分类号
TB3 [工程材料学]; TS [轻工业、手工业、生活服务业];
学科分类号
0805 ; 080502 ; 0822 ;
摘要
引用
收藏
页码:60 / 64
页数:5
相关论文
共 50 条
  • [31] CONCERTO at APEX: Installation and Technical Commissioning
    Monfardini, A.
    Beelen, A.
    Benoit, A.
    Bounmy, J.
    Calvo, M.
    Catalano, A.
    Goupy, J.
    Lagache, G.
    Ade, P.
    Barria, E.
    Bethermin, M.
    Bourrion, O.
    Bres, G.
    De Breuck, C.
    Desert, F-X
    Duvauchelle, G.
    Fasano, A.
    Fenouillet, T.
    Garcia, J.
    Garde, G.
    Hoarau, C.
    Hu, W.
    Lambert, J-C
    Levy-Bertrand, F.
    Lundgren, A.
    Macias-Perez, J.
    Marpaud, J.
    Pisano, G.
    Ponthieu, N.
    Prieur, L.
    Roni, S.
    Roudier, S.
    Tourres, D.
    Tucker, C.
    Cantzler, M.
    Caro, P.
    Diaz, M.
    Duran, C.
    Montenegro, F.
    Navarro, M.
    Olguin, R.
    Palma, F.
    Parra, R.
    Santana, J.
    JOURNAL OF LOW TEMPERATURE PHYSICS, 2022, 209 (5-6) : 751 - 757
  • [32] Century gets hi-tech roll grinder
    Aluminium Today, 1998, 10 (03):
  • [33] Waldrich Siegen - Roll grinder for the PM 4 project
    不详
    WOCHENBLATT FUR PAPIERFABRIKATION, 2003, 131 (21): : 1298 - +
  • [34] DEVELOPMENT OF ONLINE ROLL GRINDER FOR HOT STRIP MILLS
    KAN, M
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1215 - 1215
  • [35] Installation and commissioning of the ATLAS LAr readout electronics
    Ye, Jingbo
    Calorimetry in High Energy Physics, 2006, 867 : 309 - 316
  • [36] Installation, commissioning and performance of IDs installed at ALBA
    Campmany, J.
    Marcos, J.
    Massana, V.
    Becheri, F.
    Gigante, J. V.
    Colldelram, C.
    Ribo, Ll
    11TH INTERNATIONAL CONFERENCE ON SYNCHROTRON RADIATION INSTRUMENTATION (SRI 2012), 2013, 425
  • [37] Installation and commissioning of the Electromagnetic Calorimeter in the HADES experiment
    Opichal, A.
    Kohout, P.
    Kohoutova, A.
    Kollarczyk, J.
    Krupa, L.
    Kugler, A.
    Galatyuk, T.
    Grunwald, M.
    Rost, A.
    Tlusty, P.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2025, 1071
  • [38] ASSEMBLY, INSTALLATION, AND COMMISSIONING OF THE ATLAS UPGRADE CRYOMODULE
    Fuerst, J. D.
    Gerbick, S. M.
    Kelly, M. P.
    Kedzie, M.
    MacDonald, S.
    Ostroumov, P. N.
    Pardo, R. C.
    Sharamentov, S.
    Shepard, K. W.
    Zinkann, G. P.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 55A AND 55B, 2010, 1218 : 815 - +
  • [39] INSTALLATION, TESTING & COMMISSIONING OF CABLES AND ACCESSORIES.
    Anon
    Electrical India, 1987, 27 (13): : 23 - 32
  • [40] Installation of the AGATA Demonstrator and commissioning experiments at LNL
    Recchia, Francesco
    XVIII INTERNATIONAL SCHOOL ON NUCLEAR PHYSICS, NEUTRON PHYSICS AND APPLICATIONS, 2010, 205