Operation of a gas turbine air bottoming cycle at part load

被引:0
|
作者
Czaja, Daniel [1 ]
Chmielniak, Tadeusz [1 ]
Lepszy, Sebastian [1 ]
机构
[1] Silesian Tech Univ, Inst Power Engn & Turbomachinery, Gliwice, Poland
来源
JOURNAL OF POWER TECHNOLOGIES | 2013年 / 93卷 / 05期
关键词
part-load operation; air bottoming cycle; gas turbine air bottoming cycle; gas turbine;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The purpose of this study is to analyze the performance characteristics of a gas turbine air bottoming cycle operating under part-load conditions. In terms of energy efficiency, the most effective option for each installation is to operate under a nominal load. However, different applications have different needs. Marine gas turbines, for instance, should feature a high value of efficiency across a wide range of load. There are numerous other examples of installations which most of the time operate at generating power levels significantly lower than maximum capacity. This paper presents a two-shaft gas turbine air bottoming cycle. The gas turbine is coupled to the air part by means of an air heat exchanger. This configuration allows the gas turbine to operate at a nominal load while the cycle power output is regulated by the air turbine partial load. However, due to the fact that the air turbine to gas turbine mechanical power output ratio is about 0.17...0.20, it is necessary to consider a variant where the gas turbine also operates under a partial load. Selected results are summarized and compared with those obtained for a standalone gas turbine unit.
引用
下载
收藏
页码:279 / 286
页数:8
相关论文
共 50 条
  • [41] A solar micro gas turbine system combined with steam injection and ORC bottoming cycle
    Xiao, Gang
    Chen, Jinli
    Ni, Mingjiang
    Cen, Kefa
    ENERGY CONVERSION AND MANAGEMENT, 2021, 243
  • [42] Numerical heat transfer analysis of Maisotsenko Humid Air Bottoming Cycle - A study towards the optimization of the air-water mixture at bottoming turbine inlet
    Tariq, Rasikh
    Sheikh, Nadeem Ahmed
    APPLIED THERMAL ENGINEERING, 2018, 133 : 49 - 60
  • [43] The effect of gas turbine coolant modulation on the part load performance of combined cycle plants - Part 2: combined cycle plant
    Kim, TS
    Ro, ST
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART A-JOURNAL OF POWER AND ENERGY, 1997, 211 (06) : 453 - 459
  • [44] Bottoming organic Rankine cycle for a small scale gas turbine: A comparison of different solutions
    Clemente, Stefano
    Micheli, Diego
    Reini, Mauro
    Taccani, Rodolfo
    APPLIED ENERGY, 2013, 106 : 355 - 364
  • [45] Protecting Steam Cycle Components During Low-Load Operation of Combined Cycle Gas Turbine Plants
    Moelling, Dave
    Jackson, Peter
    Malloy, Jim
    POWER, 2015, 159 (03) : 42 - 45
  • [46] Bottoming organic cycle for gas turbines
    Bronicki, Lucien Y.
    Schochet, Daniel N.
    Proceedings of the ASME Turbo Expo 2005, Vol 5, 2005, : 79 - 86
  • [47] INVESTIGATION OF THE BOTTOMING CYCLE FOR HIGH EFFICIENCY COMBINED CYCLE GAS TURBINE SYSTEM WITH SUPERCRITICAL CARBON DIOXIDE POWER CYCLE
    Cho, Seong Kuk
    Kim, Minseok
    Baik, Seungjoon
    Ahn, Yoonhan
    Lee, Jeong Ik
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 9, 2015,
  • [48] PART LOAD BEHAVIOR OF THE LP PART OF AN INDUSTRIAL GAS TURBINE
    Petrovic, Milan V.
    Wiedermann, Alexander
    Nedeljkovic, Srecko M.
    Banjac, Milan
    PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 2A, 2017,
  • [49] GAS TURBINE EVAPORATIVE COOLING, A NOVEL METHOD FOR COMBINED CYCLE PLANT PART LOAD OPTIMIZATION
    Carmona, Jose
    PROCEEDINGS OF THE ASME 2021 POWER CONFERENCE (POWER2021), 2021,
  • [50] Backpressure adjustable gas turbine combined cycle: A method to improve part-load efficiency
    Li, Yongyi
    Zhang, Guoqiang
    Bai, Ziwei
    Song, Xiaowei
    Wang, Ligang
    Yang, Yongping
    ENERGY CONVERSION AND MANAGEMENT, 2018, 174 : 739 - 754