共 50 条
- [31] Application of the surrogate gradient method for a multi-item single-machine dynamic lot size scheduling problem SN Applied Sciences, 2021, 3
- [33] QUASI-VARIATIONAL INEQUALITY APPROACH TO MULTIITEM SINGLE-MACHINE LOT SCHEDULING PROBLEM LECTURE NOTES IN CONTROL AND INFORMATION SCIENCES, 1992, 180 : 885 - 893
- [36] SCHEDULING A MULTI-PRODUCT SINGLE MACHINE SYSTEM FOR AN INFINITE PLANNING PERIOD MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 18 (04): : B240 - B241
- [40] The effect of shop floor continuous improvement programs on the lot size-cycle time relationship in a multi-product single-machine environment INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 52 (5-8): : 669 - 681