共 50 条
- [41] Evaluation of stress measurements in NATM tunnels at the Jubilee Line Extension Project TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 325 - 330
- [42] Construction of Waterloo Station upper level tunnels, Jubilee Line Extension Project TUNNELLING '97, 1997, : 639 - 662
- [43] On Line temperature measurement system in the laying of high-voltage power-line conductors by topographic surveying DYNA, 2011, 86 (01): : 89 - 94
- [45] Devising a methodology for an impact assessment of the effects of the Jubilee Line Underground Extension, London WORLD TRANSPORT RESEARCH, VOLS 1 TO 4: VOL 1: TRANSPORT MODES AND SYSTEMS; VOL 2: PLANNING, OPERATION, MANAGEMENT AND CONTROL; VOL 3: TRANSPORT MODELLING/ASSESSMENT; VOL 4: TRANSPORT POLICY, 1999, : B485 - B498
- [46] Jubilee Line extension, Bermondsey station box: Design modifications, instrumentation and monitoring GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 99 - 104
- [50] SURVEYING THE SURVEY JOURNAL OF THE AMERICAN PHARMACEUTICAL ASSOCIATION-PRACTICAL PHARMACY EDITION, 1946, 7 (11): : 511 - 512